My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_4/7/22 ASP RCSI APPENDICES
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440011
>
CORRESPONDENCE_4/7/22 ASP RCSI APPENDICES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2024 9:15:14 AM
Creation date
5/14/2024 10:49:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
4/7/22 ASP RCSI APPENDICES
RECORD_ID
PR0440011
PE
4445
FACILITY_ID
FA0006918
FACILITY_NAME
FORWARD RESOURCE RECOVERY FACI
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
01
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
336
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> Page 25 <br />between 400 and 1040 Fahrenheit. <br /> <br /> Verify that ends of extrusion welds that are more than 5 minutes old, are ground to <br />expose new material before restarting a weld. <br /> <br /> Verify that contact surfaces of the panels are clean, and free of dust, grease, dirt, debris <br />and moisture before welding. <br /> <br /> Verify that welds are free of dust, rocks and other debris. <br /> <br /> Verify that cross seams are ground to a smooth incline before welding (fusion welding <br />only). <br /> <br /> Verify that all seams are overlapped a minimum of 3 inches or in accordance with <br />manufacturer's recommendations, whichever is more stringent. <br /> <br /> Verify that solvents or adhesives are not present in the seam area. <br /> <br /> Verify that procedures used to temporarily hold the panels together do not damage the <br />panels and do not preclude CQA testing. <br /> <br /> Verify that strips of geomembrane, wide enough and long enough to protect the hot <br />wedge welder from running on the subgrade is placed below the geomembrane. These <br />strips may be as long as the seam itself or shorter and moved with the seaming <br />equipment. If necessary, a firm material such as a flat board or similar hard surface may <br />be placed directly under the weld overlap to achieve firm support. <br /> <br /> Verify that panels are being welded in accordance with the Construction Drawings and <br />Specifications. <br /> <br /> Verify that there is no free moisture in the weld area. <br /> <br /> Measure surface temperature of the panels every 2 hours. <br /> <br />4.2.4 Seam Testing <br /> <br />Nondestructive Seam Testing. The purpose of nondestructive geomembrane testing is to detect <br />discontinuities or holes in the seams. Nondestructive geomembrane tests include vacuum and air <br />pressure testing. Nondestructive testing must be performed over the entire length of the seam. <br /> <br />It is the Geosynthetic Contractor's responsibility to perform all nondestructive testing as part of his <br />quality control (QC) program. The QA/QC Inspector's responsibility is to observe and document that <br />the Geosynthetic Contractors QC testing is in compliance with the Specifications and to document
The URL can be used to link to this page
Your browser does not support the video tag.