My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_4/7/22 ASP RCSI APPENDICES
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440011
>
CORRESPONDENCE_4/7/22 ASP RCSI APPENDICES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2024 9:15:14 AM
Creation date
5/14/2024 10:49:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
4/7/22 ASP RCSI APPENDICES
RECORD_ID
PR0440011
PE
4445
FACILITY_ID
FA0006918
FACILITY_NAME
FORWARD RESOURCE RECOVERY FACI
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
01
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
336
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> Page 26 <br />seam defects and repairs. <br /> <br />Nondestructive testing procedures are described below: <br /> <br /> For welds tested by vacuum method the weld is placed under suction utilizing a vacuum <br />box constructed with rigid sides, a transparent top for viewing the seams, a neoprene <br />rubber gasket attached to the bottom of the rigid sides, a vacuum gauge on the inside, and <br />a valve assembly attached to a vacuum hose connection. The box is placed over a seam <br />section that has been thoroughly saturated with a soapy water solution (1 oz. soap to 1 <br />gallon water). The rubber gasket on the bottom of the box must fit snugly against the <br />soaped seam section of the panel, to ensure a leak-tight seal. A vacuum pump is <br />energized and the vacuum box pressure reduced to approximately 5-psi gauge. Any <br />pinholes, porosity or non-bonded areas are detected by the appearance of soap bubbles in <br />the vicinity of the defect. Dwell time must not be less than 10 seconds. <br /> <br /> Air pressure testing is used to test double seams that have enclosed air space between <br />them. Both ends of the air channel must be sealed. A pressure feed device, usually a <br />needle equipped with a pressure gauge, is inserted into one end of the channel. Air is <br />then pumped into the channel to a minimum pressure of 30 psi or 1/2 psi per mil of <br />geomembrane thickness, whichever is greater. A two-minute relaxing period is allowed <br />for the pressure to stabilize. The air chamber must sustain the pressure for a further 5 <br />minutes without losing more than 2 psi. Following a passed pressure test, the opposite <br />end of the tested seam must be punctured to release the air. The pressure gauge must <br />return to zero, if not, a blockage is likely in the seam channel. Locate the blockage and <br />test the seam on both sides of the blockage. The penetration holes must be sealed after <br />testing. <br /> <br />During nondestructive testing, the QA/QC Inspector will: <br /> <br /> Review Specifications regarding test procedures. <br /> <br /> Verify that equipment operators are fully trained and qualified to perform their work. <br /> <br /> Verify that test equipment meets Specifications. <br /> <br /> Verify the entire length of each seam is tested in accordance with the Specifications. <br /> <br /> Observe all continuity testing and record results on the panel/seam log, and the panel <br />layout drawing. <br /> <br /> Verify that all testing is completed in accordance with the Specifications. <br /> <br /> Identify any failed areas, by marking the area with a waterproof marker compatible with
The URL can be used to link to this page
Your browser does not support the video tag.