My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_4/7/22 ASP RCSI APPENDICES
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440011
>
CORRESPONDENCE_4/7/22 ASP RCSI APPENDICES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2024 9:15:14 AM
Creation date
5/14/2024 10:49:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
4/7/22 ASP RCSI APPENDICES
RECORD_ID
PR0440011
PE
4445
FACILITY_ID
FA0006918
FACILITY_NAME
FORWARD RESOURCE RECOVERY FACI
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
01
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
336
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> Page 27 <br />geomembrane, inform the Geosynthetics Contractor of any required repairs, and record <br />the repair on the panel/seam log. <br /> <br /> Verify that all repairs are completed and tested in accordance with the Specifications. <br /> <br /> Record all completed and tested repairs on a repair sheet, and the panel layout drawing. <br /> <br />Destructive Seam Sampling Procedures and Field Testing. Destructive seam samples will be <br />taken at intervals of at least one test per 500 linear feet of geomembrane seams. However, additional <br />samples will be taken if the QA/QC Inspector suspects that a seam does not meet the Specification <br />requirements. Reasons for taking additional samples may include, but are not limited to: <br /> <br /> Wrinkling in seam area <br /> Excess crystallinity <br /> Suspect seaming equipment or techniques <br /> Weld contamination <br /> Insufficient overlap <br /> Adverse weather conditions <br /> Failing tests <br /> <br />The QA/QC Inspector selects the locations from where seam samples will be cut for destructive <br />laboratory testing as follows: <br /> <br /> A minimum of one test per 500 feet of seam length. This is an average frequency for the <br />entire installation; individual samples may be taken at greater or lesser intervals. The <br />testing frequency will be increased if welding operations were conducted in temperatures <br />below 400F. This increase will be agreed upon by the Construction Manager, QA/QC <br />Manager, and Geosynthetics Contractor. <br /> <br /> A maximum frequency must be agreed to by the Construction Manager, QA/QC <br />Manager, and Geosynthetics Contractor at the pre-construction meeting. However, if the <br />number of failed samples exceeds 5 percent of the tested samples, this frequency may be <br />increased at the discretion of the QA/QC Manager. Samples taken as the result of failed <br />tests do not count toward the total number of required tests. <br /> <br />The QA/QC Inspector will not inform the Geosynthetics Contractor in advance of selecting the <br />destructive sample locations. <br /> <br />The Geosynthetics Contractor will remove specimens and samples at locations identified by <br />the QA/QC Inspector and field test the specimens for peel and shear before the samples are <br />shipped off-site for laboratory testing. During sampling procedures the QA/QC Inspector <br />will: <br />
The URL can be used to link to this page
Your browser does not support the video tag.