My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_4/7/22 [REV] APPENDICES W/FIRE PERMIT
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440011
>
CORRESPONDENCE_4/7/22 [REV] APPENDICES W/FIRE PERMIT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2024 8:31:35 AM
Creation date
5/14/2024 10:57:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
4/7/22 [REV] APPENDICES W/FIRE PERMIT
RECORD_ID
PR0440011
PE
4445
FACILITY_ID
FA0006918
FACILITY_NAME
FORWARD RESOURCE RECOVERY FACI
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
01
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />FORWARD COMPOST FACILITY STORMWATER IMPROVEMENTS GEOSYNTHETC <br />02777 3 CLAY LINER <br /> <br />1.6 PACKING AND SHIPPING <br /> A. Geosynthetic clay liners shall be supplied in rolls wrapped in liquid impermeable and opaque protective covers. <br /> B. Geosynthetic clay liners shall be marked or tagged with the following information: 1. manufacturer's name; 2. product identification; 3. lot number; 4. roll number; and 5. roll dimensions. <br /> C. Transportation of the prefabricated geosynthetic clay liner is the responsibility of the GEOSYNTHETICS CONTRACTOR. The GEOSYNTHETICS CONTRACTOR shall be liable for all damages to the materials incurred prior to and during transportation to the site. <br />1.7 DELIVERY, STORAGE, AND PROTECTION <br />A. Delivery. 1. Deliver materials to the site only after the QA/QC CONSULTANT accepts required submittals. 2. Separate damaged rolls from undamaged rolls and store at locations designated by the OWNER until proper disposition of material is determined by the QA/QC CONSULTANT and the OWNER. 3. The GEOSYNTHETICS CONTRACTOR shall be responsible for damage to the GCL during delivery, even if the rolls are unloaded by the EARTHWORK CONTRACTOR. The QA/QC CONSULTANT will determine damage. B. Handling, storage, and care of the geosynthetic clay liner, prior to and following installation, are the responsibility of the GEOSYNTHETICS CONTRACTOR, until Final Acceptance of the liner system by the OWNER. <br /> C. The GCL shall be protected from moisture, excessive heat or cold, puncture, or other damaging or deleterious conditions. The GCL shall be stored off the ground and out of direct sunlight. Any additional storage procedures required by the manufacturer shall be the GEOSYNTHETICS CONTRACTOR’S responsibility. <br />1.8 SEQUENCING AND SCHEDULING <br /> A. A pre-installation meeting shall be held to coordinate the installation of the geosynthetic clay liner with the installation of other components of the lining system. <br /> B. The geosynthetic clay liner shall be on-site fourteen days prior to the scheduled installation date or available for sampling at the manufacturing plant to allow for
The URL can be used to link to this page
Your browser does not support the video tag.