My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_4/7/22 [REV] APPENDICES W/FIRE PERMIT
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440011
>
CORRESPONDENCE_4/7/22 [REV] APPENDICES W/FIRE PERMIT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2024 8:31:35 AM
Creation date
5/14/2024 10:57:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
4/7/22 [REV] APPENDICES W/FIRE PERMIT
RECORD_ID
PR0440011
PE
4445
FACILITY_ID
FA0006918
FACILITY_NAME
FORWARD RESOURCE RECOVERY FACI
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
01
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />FORWARD COMPOST FACILITY STORMWATER IMPROVEMENTS GEOSYNTHETC <br />02777 8 CLAY LINER <br /> <br /> D. The overlaps shall not be nailed or stapled to the subgrade. <br /> E. Granular bentonite shall be placed on the overlaps. <br />3.7 MATERIALS IN CONTACT WITH THE GEOSYNTHETIC CLAY LINER <br /> A. Installation on rough surfaces shall be carefully performed to minimize damage to the geosynthetic clay liner. <br /> B. Equipment used for placing soils shall not be driven directly on the geosynthetics overlying the geosynthetic clay liner. The following table shall be complied with during construction: <br />Maximum Equipment Ground Pressure (psi) <br /> Initial Lift Thickness (ft) <br />5 1.0 <br />10 1.5 <br />20 2.0 <br />>20 >3.0 <br /> <br />C. Installation of the geosynthetic clay liner areas with appurtenances areas, and connection of the geosynthetic clay liner to appurtenances shall be made according to the Construction Drawings. The GEOSYNTHETICS CONTRACTOR shall ensure that the geosynthetic clay liner is not damaged while working around the appurtenances. <br /> <br />3.8 REPAIR <br /> A. Any holes or tears in the geosynthetic clay liner shall be repaired by placing a geosynthetic clay liner patch over the hole. On slopes greater than 5 percent, the patch shall overlap the edges of the hole or tear by a minimum of 2 ft (0.6 m) in all directions. On slopes 5 percent or flatter, the patch shall overlap the edges of the hole or tear by a minimum of 1 ft (0.3 m) in all directions. The patch shall be secured with a water-based adhesive, if approved by the Manufacturer and by the QA/QC CONSULTANT. <br /> B. Care shall be taken to remove any soil or other material that may have penetrated the torn geosynthetic clay liner. <br /> C. All repairs shall be made at no additional cost to the OWNER. <br /> D. The patch shall not be nailed or stapled.
The URL can be used to link to this page
Your browser does not support the video tag.