My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_4/7/22 [REV] APPENDICES W/FIRE PERMIT
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440011
>
CORRESPONDENCE_4/7/22 [REV] APPENDICES W/FIRE PERMIT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2024 8:31:35 AM
Creation date
5/14/2024 10:57:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
4/7/22 [REV] APPENDICES W/FIRE PERMIT
RECORD_ID
PR0440011
PE
4445
FACILITY_ID
FA0006918
FACILITY_NAME
FORWARD RESOURCE RECOVERY FACI
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
01
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />FORWARD COMPOST FACILITY STORMWATER IMPROVEMENTS GEOSYNTHETC <br />02777 9 CLAY LINER <br /> <br />3.9 PRODUCT PROTECTION <br />A. The GEOSYNTHETICS CONTRACTOR shall use all means necessary to protect all prior work and materials and completed work of other Sections. <br />B. In the event of damage, the GEOSYNTHETICS CONTRACTOR shall immediately make all repairs and replacements necessary, to the approval of the QA/QC CONSULTANT and at no additional cost to the OWNER. <br />3.10 ACCEPTANCE A. GEOSYNTHETICS CONTRACTOR shall retain ownership and responsibility for GCL until accepted by OWNER. B. OWNER will accept GCL when all of the following conditions are met: 1. The installation is complete. 2. Required documentation is complete. 3. The QA/QC CONSULTANT’s final report is complete. 4. Verification of the adequacy of all seams and repairs, including associated testing, is completed. 5. Written certification documents have been received by the QA/QC CONSULTANT and OWNER. <br /> <br />PART 4 MEASUREMENT AND PAYMENT (Refer to Section 01200, MEASUREMENT AND PAYMENT PROCEDURES) <br />END OF SECTION
The URL can be used to link to this page
Your browser does not support the video tag.