Laserfiche WebLink
URS <br /> Mr. Robert McClellon <br /> May 18, 2006 <br /> Page 3 <br /> the preservative. The groundwater samples will be placed into the analytical laboratory prepared <br /> sample containers. <br /> • Groundwater samples will be labeled and placed in ice chests with ice. The samples will be <br /> transported by vehicle or shipped to the analytical laboratory for VOC analysis by EPA Method <br /> 8260B under proper chain-of-custody procedures. <br /> The purged water will be disposed of properly,based on the analytical results of the collected <br /> groundwater samples. <br /> PERMIT <br /> Enclosed with this letter work plan are the completed application for the Well/Pump Permit application <br /> required for the groundwater monitoring wells installation,and a check for the amount of$368 to cover <br /> the permit fees. <br /> SCHEDULE <br /> Following your approval of this work plan, we estimate that the field activities to install the wells could <br /> be completed within two weeks,pending drilling contractor availability. The wells could be developed <br /> and sampled within the week following the well installation activities. We expect that that analytical <br /> laboratory will have the analytical results to us within three weeks of the groundwater sampling <br /> activities. We plan to submit a report with the description of the field activities to install and sample the <br /> wells and the results of these activities as part of the subsequent quarterly monitoring report. <br /> If you have any questions concerning this work plan, please give me a call at(916) 679-2081. <br /> Very truly yours, <br /> URS Corporation <br /> famine <br /> Engineer <br /> Figure 1 <br /> Figure 2 <br /> Completed Well Application <br /> Check for$368 <br /> cc: Judy McCampbell (RadioShack) <br />