My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2005-2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TURNPIKE
>
3504
>
4400 - Solid Waste Program
>
PR0515730
>
CORRESPONDENCE_2005-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2026 8:44:26 AM
Creation date
6/27/2024 2:23:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2005-2006
RECORD_ID
PR0515730
PE
4430 - SOLID WASTE CIA SITE
FACILITY_ID
FA0012310
FACILITY_NAME
WORLD ENTERPRISES
STREET_NUMBER
3504
Direction
S
STREET_NAME
TURNPIKE
STREET_TYPE
RD
City
STOCKTON
Zip
95206
APN
17517018
CURRENT_STATUS
Active, billable
SITE_LOCATION
S TURNPIKE RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
Site Address
3504 S TURNPIKE RD STOCKTON 95206
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
382
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
where this settlement may decr ase the effectiveness of the pas ive soil <br />vapor extraction trench. The overall objective of this project is to <br />prevent methane from migrating offsite. To achieve this objective, the <br />soil above the trench will be compacted to minimize migration of methane <br />through this soil so that methane will migrate towards the passive soil <br />vapor extraction trench. As soil compaction increases, pore space <br />decreases. As pore space decreases, methane migration decreases as well as <br />the potential for settlement decreases. Hence, we feel that vehicular <br />traffic over the trench will not likely cause a decrease the effectiveness <br />of the passive soil vapor extraction trench. Since you have this concern, <br />the trench location will be marked as you suggested with a rope or another <br />method (as approved by you) to prevent any type of traffic over the trench <br />after its installation. We recognize that the vent pipes will need to be <br />protected from vehicles and we plan to install either bollards around each <br />vent pipe. <br />5. The site will be posted with the contact information following the <br />completion of the construction activities. <br />If I have misunderstood the information provided in our discussion you have <br />any questions, please let me know. I can be reached either through e-mail <br />message or by calling me at (916) 679-2081. <br />Take care, <br />Jay <br />This e-mail and any attachments are confidential. If you receive this <br />message in error or are not the intended recipient, you should not retain, <br />distribute, disclose or use any of this information and you should destroy <br />the e-mail and any attachments or copies. <br />"Robert McClellon <br />[EH]" <br /><RMcClellon@sjceh To <br />d.com> <Jay_Kamine@URSCorp.com> <br />cc <br />08/25/2006 03:54 <br />PM <br />RE: Passive Soil Vent Plan <br />Jay, here are the comments so far. <br />5 <br />Subject <br />
The URL can be used to link to this page
Your browser does not support the video tag.