Laserfiche WebLink
SEMINSIX Emergency Response Plan <br /> 6.1 COMMUNICATIONS <br /> The PM will ensure that communications capability exists at the site to summon emergency services and <br /> to contact key personnel/agencies.This may be done with a cell phone,however,the SSO must verify at <br /> the site that the communication device functions correctly before any work begins. <br /> 6.2 POTENTIAL INCIDENTS <br /> Potential incidents or actual incidents are typically preceded by a"Near Loss".A near loss is an incident <br /> that could result in injury or property damage,if repeated. A near loss usually indicates that accident <br /> prevention measures failed or may be lacking and that a serious incident may occur if similar events <br /> leading up to a near loss are repeated. Field team members are required to provide documentation on <br /> recognized near loss events.Near losses will be recorded by the URS SSO and the appropriate URS staff, <br /> or by the URS subcontractor as they occur.A digital photo is recommended to be taken and submitted to <br /> the PM and the Regional Health and Safety Manager(RSM) along with the completed Near Loss Report. <br /> Although unlikely,the following situations could potentially occur and would require emergency <br /> response actions: <br /> • Sudden release of airborne contaminants (e.g.,vapors,combustible gases); <br /> • Uncontrolled releases and spills; <br /> • Exposure to biological hazards; <br /> • Fire; <br /> • Medical emergency; and <br /> • Acute exposure(inhalation,skin contact,eye contact). <br /> 6.2.1 Release of Hazardous Airborne Contaminants <br /> In the event of a sudden release of contaminants(e.g.,vapors, gases,and particulates)constituting a <br /> potentially hazardous situation(e.g.,adequate respiratory protection is unavailable, Imminently <br /> Dangerous to Life or Health(IDLH) or explosive atmospheres,imminent worker or public safety or <br /> health hazard),the SSO will halt operations and evacuate the work site using appropriate emergency <br /> signals(e.g., air horn,alarm,or hand signals).The SSO,PM,or RSM will notify appropriate emergency <br /> response and supervisory personnel. The SSO will assist response personnel to control and stop the <br /> release. After the release has been halted,the SSO will be responsible for monitoring the work site for the <br /> presence of any remaining airborne hazards and,in consultation with the project team supervisory <br /> personnel,determine when it is safe to restart field activities. <br /> 6.2.2 Releases and Spills <br /> The PM will ensure that sufficient quantities of sorbent materials,pads,booms, or pillows,and other <br /> cleanup materials and equipment are available at the work site to neutralize spills and provide for a quick, <br /> UMH:\WPROCESS\25532\WORLDENTERPRISE\WELL DESTRUCTIONWTTACHMENT C WORLD ENTERPRISES HSP TG EDITS.DOC\1 8-NOV-1 1\\6-2 <br />