Laserfiche WebLink
I� M g M no as M M MIN IM M IM111 11" . <br /> Safe Work Plan <br /> For those major tasks identified in the Scope of Work, complete the Job Safety Analysis below. Use additional sheets, as <br /> necessary. <br /> Work Activity: Well destructions <br /> K+ �r Hds) z;Trair etrrntea►tettt+l� Eq4t ►nnt 1J <br /> 1. Slip, trip, falls 1Hazardous Waste 1Initially wear modified Level D PPE (including <br /> 2. Drill rig tipping Operations hard hat, safety glasses, nitrile gloves, steel- <br /> 3. Contact with overhead or underground 2. Operation of air monitoring toed work boots, regular tyvek). <br /> utilities equipment 2. Upgrade to Level C respiratory protection if air <br /> 4. Exposure to site contaminants or 3. Operation of drill rig monitoring results exceed action levels. <br /> explosive atmospheres 4. Use of personal protective 3. Use hearing protection during all activities <br /> 5. Excessive noise equipment, including involving drill rigs. <br /> 6. Strains, sprains respiratory protection 4. Use safety vests when working near heavy <br /> 7. Rotating equipment 5. Hazard communication equipment <br /> 8. Excavation 5. Wear heavy leather gloves during well sealant <br /> 9. Chemical exposure to methane, 1-12S, mixing/installation or tool use. <br /> CO. Metals in groundwater <br /> 10.Chemical burns from contact with wet <br /> sealant material <br /> 11.Inhalation of particulate dusts <br /> 12.Physical injury from hand tool use <br /> 13.Fire, explosion <br />