My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2013-2024
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SANTA FE
>
23201
>
4400 - Solid Waste Program
>
PR0504223
>
CORRESPONDENCE_2013-2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2024 11:52:21 AM
Creation date
7/11/2024 12:07:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2013-2024
RECORD_ID
PR0504223
PE
4430
FACILITY_ID
FA0006129
FACILITY_NAME
BILL LANE DUMP
STREET_NUMBER
23201
Direction
S
STREET_NAME
SANTA FE
STREET_TYPE
RD
City
ESCALON
Zip
95320
APN
249-060-14
CURRENT_STATUS
01
SITE_LOCATION
23201 S SANTA FE RD
P_DISTRICT
005
QC Status
Pending
Scanner
SJGOV\cfield
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11-1 <br />Mr. Robert McClellon <br />September 22, 2004 <br />Page 6 of ll <br />The debris in these areas will be consolidated using an International E295 scraper, a Caterpiller <br />977C bulldozer, and a Caterpiller 613 scraper.All equipment will be operated by Gained heavy <br />equipment operators. <br />Based upon the analytical results of soil and groundwater samples collected at the site in July <br />2004, the soil at the site should not be considered a designated waste and a Title 27 prescriptive 'P <br />landfill cover, therefore, is not warranted.Mr. Palomino proposes to install an alternative cover ' <br />design that would essentially meet the performance requirements of Title 27, Sections 21090(a)'24-*¢cg <br />and 21 l40(b). The proposed cover design consists of the following:g¢,,,,,, <br />12-inch layer of intermediate cover foundation;a(¢¢-l(4, <br />24-inch layer of compacted support, <br />6-inch layer of crushed rock and/or asphdtic concrete. <br />The intermediate cover foundation will be placed in a single 12-inch lift and compacted to >90% <br />of maximum dry weight based on ASTM D698.After placement of the intermediate cover, the <br />compacted support layer will be spread in 12-inch loose lifts, compacted to >90% of maadumum <br />dry weight based on ASTM D 698, dry of optimtun moisture content.The surface cover shall <br />consist of 6 inches of self-compacting crushed rock and/or asphaltic concrete. The engineered <br />landfill cap will be constructed under the direct supervision of Delamare & Fulz Engineering of <br />Modesto, California. <br />3.4 Site Drainage and Erosion Control <br />Pursuant to Title 27 requirements, the final drainage plan will be designed,graded, and <br />maintained to prevent ponding and to prevent soil erosion due to high run-off velocities.The <br />drainage and erosion control plan will be submitted under separate cover by Delamare & Fulz <br />Engineering. <br />3.5 Earthmoving Along Railroad <br />No debris has been identified within 50 feet of the railroad track that parallels the western <br />property boundary. However, a small amount of mounded debris at the base of the railroad berm <br />in the southwest comer of the property (near excavation pit T26) will require excavation. <br />Delarnare & Fulz Engineering has determined that the removal of this debris will not threaten the <br />integrity of the berm.In addition to the debris located at the southwest corner of the property,#le/2/¢¢c"'"<{ <br />several areas of the berm were used by previous owner(s) as a soil borrow area.Mr. Palomino 944-1 <br />will place native soil in these borrow areas, as well as in the southeast corner of the property after fn /,., rw <br />die debris is removed from that location, in order to restore the berm to its previous state.af/u¢t_ <br />G:\GROUNDZE\Palomino\wp_sitcmitfinal.doc
The URL can be used to link to this page
Your browser does not support the video tag.