2 <br />Cc: 'Kurt Wagenknecht' <kurt@k12architects.com> <br />Subject: RE: Airport Plans <br /> <br />Hello <br /> <br />Below is the list of responses that we received from K12 Architects on August 11, 2023, in response to the deficiency list <br />provided by the EHD on June 13, 2023. The comments from K12 are in red, and the new comments from the EHD are in blue. I <br />do see that a new set of plans was submiƩed on October 2, 2023, these comments below are for the previous set of <br />submiƩals. In the interest of expediency, before I start reviewing the October 2nd submiƩal in detail, please let me know if any <br />revisions from the comments below, will impact the sheets that you already submiƩed on Oct 2nd and I will wait to review it all <br />at once when I receive updated sheets. Please be sure to “cloud” all the plan changed either related to my comments or <br />completely unrelated, idenƟfying changes, this helps with review and speeds up the response. <br /> <br />Also, here are the comments that were emailed on 9/28/2023: <br /> <br />1. Provide all certifications for the installer and tester, previously submitted certifications are for the old contractor <br />2. #1 from the previous deficiency list is still outstanding <br />3. Sheet CO lists 30K and 6K/24K/6K, buoyancy lists 24/6K and 6K/20K/6K, sheet T&L1 lists 6K/20K/6K <br />4. Need tank charts and overfill calculations <br />5. T&L1 lists zone 5 as DEF, which is supposed to be single-walled, correct zones. <br />6. The parts list cross reference lists wrong parts throughout the plans, I will provide some examples once I provide all <br />the comments on Tuesday. <br /> <br />Response to comments from August 2023 submiƩals are in blue: <br /> <br />1. Provide updated service requests and permit applicaƟons to remove MVP, this should also <br />include correct billing informaƟon and a fire permit number (provide a front page of the approved <br />permit). All appropriate checkboxes and monitoring details should be indicated. We have not chosen a contractor <br />yet. When we have we will update all these forms. EHD: SƟll need, be sure to include a valid fire permit for thanks <br />installaƟon. <br />2. Provide ELD workplan This is done by the contractor. EHD: SƟll need, <br />3. Provide tank charts and overfill calculaƟons See aƩached sheets. EHD: We didn’t receive this informaƟon with <br />the August 11 submiƩal from K12, however, it appears that we received tank charts with the October 2, 2023 <br />submiƩal. No overfill calculaƟons were provided and are sƟll needed. Though the exact dimensions may not be <br />known, a sample calculaƟon for the proposed overfill method is sƟll needed. <br />4. Sheet T&L1 lists 24k/6k tank and Sheet CO lists 20K/6k tank. The cover sheet is new, revised the scope of work. <br />EHD: Sheet CO submiƩed on 8/11/2023 by K12 lists “THERE IS A 32K TANK, SPLIT 6K FOR DIESEL #2, 24K FOR B20 <br />DIESEL, 6K FOR DEF.” Based on 6+24+6, the tank should be 36K, please clarify tank capaci Ɵes. Sheet T&L1, note 18 <br />lists a 32000-gallon double wall tank 6K DEF/20K diesel/6K diesel, for a total of 32K. This original EHD’s comment <br />was not addressed with 8/11/2023 submiƩal, however, It appears that some revised sheets were submiƩed on <br />10/2/2023 and will be reviewed. <br />5. IdenƟfy smart sensor locaƟons on T&L1 sheet See sheet T&L1. EHD: sensors were idenƟfied, however, there are <br />some discrepancies between the listed sensors and the parts list. Revised sheets were received on 10/2/2023 and <br />will be reviewed. See below for examples of these discrepancies. <br />6. Page T&L2 indicates that if people are entering the excavaƟon OSHA noƟficaƟon and a <br />permit is required. Please submit this permit copy for the tank set and anchoring work- if not <br />available yet, this must be submiƩed before scheduling tank set inspecƟon. Same page detail C6- <br />“1/4” fuel hose capped” – clarify if this is a fuel hose or a vacuum hose. Also on C6 detail “opening <br />through primary wall” – no openings through the primary wall are allowed. Contractor will do this. EHD: SƟll need. <br />7. IdenƟfy the means to check communicaƟon for vacuum monitoring on piping secondary <br />containment on page T&L2, UDC detail. See details EHD: corrected.