Laserfiche WebLink
Xerxes Mobilization # 1 <br /> • On March 26, 2025, Xerxes mobilized a crew to site to inspect tank primaries. <br /> Our crew located a breach from primary to interstice where one of the end <br /> tank meets the base tank. <br /> • Repair of the breach was completed with communication strips still intact. <br /> See sketch below. <br /> • All three tank primaries passed the 5-psi pressure test. However, pressure <br /> and vacuum tests of the interstice failed, indicating a secondary external <br /> breach. <br /> • Subsequently Leak Detection Technologies (LDT) was called in by Xerxes to <br /> locate the breach by utilizing their tracer gas injection technology. <br /> > alt g r 3 <br /> wre Pch m10 les <br />