My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
NEWTON
>
3932
>
2800 - Aboveground Petroleum Storage Program
>
PR0515678
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2024 3:52:41 PM
Creation date
7/30/2024 12:42:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0515678
PE
2832
FACILITY_ID
FA0010885
FACILITY_NAME
CONTI MATERIAL SVC LLC
STREET_NUMBER
3932
STREET_NAME
NEWTON
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
13206001
CURRENT_STATUS
01
SITE_LOCATION
3932 NEWTON RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mike Smith Engineering , Inc . <br /> P . O . Box 611 , Lodi , CA 95241 <br /> --=?i (209 ) 334-2332 <br /> 7-25-24 <br /> Gene Conti Jr. <br /> Conti Materials Service. LLC <br /> 3932 Newton Rd. <br /> Stockton, CA 95205 <br /> According to 40 CFR 112.6(a)(2), a professional engineer must certify all technical amendments to <br /> an existing SPCC Plan that involve "change in the facility design, construction, operation. Or <br /> maintenance ,that affects it potential for a discharge . . . ". The Conti SPCC requires an amendment. <br /> Background: Conti Materials Service owns a Cummins Onan QuietSite II generator that houses a <br /> double wall base tank with capacity of 250-gallons. It must be added to the existing SPCC Plan . <br /> Amendment: The portable Cummins Onan QuietSite II generator contains a 250-gallon diesel <br /> double wall base tank. This tank has secondary containment built in. Any tank with capacity <br /> greater than 55-gallons must be included in the SPCC Plan. <br /> Integrity Testing: The 250-gallon tank contained inside the Cummins generator shall be periodically <br /> inspected in the same manner as all other Tank Farm units, as detailed in the existing SPCC Plan. <br /> Please contact me at (209) 334-2332 if you have questions or need more information. <br /> Sincerely, <br /> Q�OFESS/O� <br /> c9 44590 m <br /> acs <br /> EXP* 3-31-26 �m <br /> Sr9rF F vC <br /> OAL\FOp�P <br /> ELECTRONICALLY SIGNED <br /> 07/25/2024 3:14:19 PM <br /> Michael W. Smith, P.E. <br /> R. C.E. 44590 <br /> Mike Smith Engineering, Inc. <br /> Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.