Laserfiche WebLink
Luis Roblejo <br /> Finish Schedule: <br /> Comment: Following CRFC for permanent and enclosed facilities below, you can find an itemized <br /> description fulfilling the finish schedule. All products and materials used inside the kitchen area are <br /> smooth, durable construction, non-absorbent, and easily cleanable. As an additional comment, this <br /> facility is a small kitchen, as seen in the plans. -No cooking equipment inside the facility- <br /> Complying with all applicable parts of sections §114265-§114272,you can find the itemized <br /> finish below. <br /> Floor: Is made of ceramic tile kitchen grade with a smooth surface that is easily cleanable by broom or <br /> mopping and sanitizing. <br /> Walls:The facility's interior walls are polished stucco smooth surfaces except for the preparation table <br /> and three bay sink areas, protected with wall-mounted stainless steel sheets. <br /> Ceiling: As an enclosed facility,the top is sheetrock(drywall),finished, polished, and painted with and <br /> finished with and smooth, cleanable surface. <br /> Coving: Coving is installed in all kitchen walls at the juncture of the floor and walls with 3/of an inch <br /> radius coving and extended up 4" through the wall following and complying with the code directions for <br /> this facility. <br /> Equipment:All equipment used inside the kitchen and required by the CRFC is NSF, ANSI, and Intertek- <br /> approved. <br /> The chemicals, equipment, and supplies will be stored outside in the back of the building for safety. <br /> The water heater brand is GE Mod. GG50T06AVG00 manufactures specs (attached.) Currently, the water <br /> heater is used only for the hand-washing sink in the restroom.The water heater capacity is 50 gallons. <br />