Laserfiche WebLink
SHEET NUMBER: <br />SHEET CONTENTS: <br />PROJECT NUMBER:PROJECT DATE: <br />CONSULTANTS: <br />Sacramento, CA 95827 <br />PH:(916) 455-6500 FAX:(916) 455-8100 <br />3090 Fite Circle, #104 <br />REVISIONS: <br />20-007 08-14-2020 <br />K12 Architects, Inc <br />DEVELOPER: <br />CONTRACTOR: <br />PROJECT: <br />Fast N <br />Easy <br />RIVER <br />ISLANDS <br /> 16460 GOLDEN VALLEY <br />PARKWAY <br />Lathrop, California 95330 <br />1 <br />Muhammad Bilal <br />10445 Chantel Lane <br />Stockton, CA 95212 <br />CONVENIENCE STORE AND <br />FUELING STATION <br />Parcel 1 <br />BUILDING DEPT. COMMENTS 10/4/21 <br />2 PLANNING DEPT REV 10/14/21 <br />3 BUILDING DEPT. COMMENTS 06/22/22 <br />3-25-2022 <br />4 BUILDING DEPT. COMMENTS 09/21/22 <br />5 FIRE DEPT. COMMENTS 10/19/22 <br />6 EHD-HAZMAT 12/12/22 <br />7 EHD-HAZMAT 02/03/23 <br />PROFESSIONAL SEALS: <br />8 ELECT MSB 06/28/23 <br />9 OWNER CHANGE 08/02/23 <br />10 WALK-IN COOLER DETAILS 10/13/23 <br />11 VEEDER-ROOT TLS-450 05/17/24 <br />87 & 91 <br />FS4.1 <br />TANK SUMPS <br />719 <br />20 <br />6 <br />FIBERGLASS CONTAINMENT SUMP TO <br />TANK COLLAR INSIDE AND OUT TO <br />INSURE WATER TIGHTNESS <br />42" MULTIPORT MANHOLE <br />W/ LIQUID TIGHT & <br />VAPOR TIGHT FILL BOX <br />SUMP SHIELD <br />JUNCTION BOX <br />3/4" CONDUIT FROM ANNULAR <br />SPACE MONITOR JUNCTION BOX <br />SUMP PENETRATION BOOT <br />3/4" CONDUIT TO TURBINE SUMP <br />JUNCTION BOX <br />EXTRACTOR FITTING <br />3" OVER 2" F.R.P. VENT LINE <br />2" BELLxMALE F.R.P. <br />THREADED ADAPTOR <br />USE OPW RISER SUPPORT BRACKETS (BRACELETS) <br />NOTES: <br />STEEL PLATE AT TANK BOTTOM <br />4" ALUMINUM FILL TUBE w/ POSITIVE <br />SHUT OFF DEVICE: INSTALL AT 95% <br />OF TANK CAPACITY <br />91 GAS, FILL, AND VENT DETAIL <br />21 <br />18 <br />2" IN 3" CONDUIT PRESSURE LINE <br />TO TURBINE SUMP, PRIMARY LINE <br />OPEN FOR ELECT OR MONITOR <br />WIRES. <br />LIQUID SENSOR INSTALL AT <br />LOWEST POINT TO ENSURE <br />LIQUID DETECTION AT <br />EARLIEST POSSIBLE MOMENT <br />TANK LEVEL MONITOR <br />79 <br />DOUBLE WALL <br />CONTAINMENT SUMP <br />5 <br />8 <br />74 <br />BRAVO TEST PORT WITH <br />HOSE AND CONNECTION <br />CAP <br />BRAVO FILL PORT <br />BRINE INTERSTITIAL <br />SENSOR <br />13 <br />27 <br />FUEL SWIVEL ADAPTOR <br />1" MIN. CLR TO SUMP <br />4" TOP SEAL <br />ADAPTOR & CAP <br />4" ALUMINUM FILL TUBE <br />PERPENDICULAR PENETRATIONS OF CONTAINMENT SUMPS <br />PREFERRED. 15° MAXIMUM ALLOWABLE PENETRATION ANGLE. <br />USE SUMP PENETRATION BOOTS AT ALL PENETRATIONS OF <br />SUMP. <br />ALL JUNCTION BOXES ARE TO BE PLACED WITHIN 1'-0" OF THE <br />TOP OF SUMP. <br />1. <br />2. <br />3. <br />4. <br />79 <br />SCALE:3/4" = 1'-0" <br />91 GAS TURBINE SUMP PLAN VIEW <br />EXPLOSION PROOF <br />JUNCTION BOX <br />SUMP SENSOR, INSTALL AT LOWEST POINT <br />TO ENSURE LIQUID DETECTION AT EARLIEST <br />POSSIBLE MOMENT <br />2"x18" FLEXIBLE CONNECTOR <br />MALE BY MALE SWIVEL <br />3"x2" BOOT WITH TEST PORT <br />2" SCH. 40 FRP. BELL x FEMALE <br />THREADED ADAPTER <br />1" CONDUIT TO INTRINSICALLY SAFE <br />GUTTER AT MONITOR CONTROL <br />PANEL (1 PER TANK) <br />3/4" CONDUIT TO TLM <br />3" OVER 2" PRODUCT, TO <br />DISPENSERS <br />DOUBLE WALL <br />CONTAINMENT SUMP <br />TURBINE PUMP <br />2" BALL VALVE (MAKE HANDLE <br />ACCESSIBLE FROM GRADE)42 <br />3/4" CONDUIT FOR PUMP <br />POWER TO ELECT. PANEL <br />-1 PER TANK <br />42" WATERTIGHT MANHOLE5 <br />41 <br />38 <br />BRINE INTERSTITIAL <br />SENSOR <br />VACUUM SENSOR <br />AND HOSE 80 <br />USE SIPHON JET PORT FOR <br />VACUUM GENERATION <br />5 <br />CHECK VALVE FOR LEAK <br />DETECTOR <br />79 <br />79 <br />TANK LEVEL MONITOR <br />36 <br />81 <br />LEAK DETECTOR <br />TURBINE PUMPJUNCTION BOX <br />(EXPLOSION PROOF) <br />PENETRATION BOOT <br />THIS PIPE TO FILL SUMP <br />3/4" CONDUIT TO ELECT. <br />PANEL (PUMP POWER) <br />1" CONDUIT TO INTRINSICALLY <br />SAFE GUTTER AT MONITOR <br />CONTROL PANEL (1 PER TANK) <br />3/4" CONDUIT TO FILL/ VAPOR <br />SUMP JUNCTION BOX <br />CONTAINMENT SUMP REDUCER, <br />FIBERGLASS REDUCER ON THE OUTSIDE <br />TO ENSURE WATER TIGHTNESS <br />2"x18" FLEXIBLE CONNECTOR MALE BY <br />MALE SWIVEL <br />SCALE:3/4" = 1'-0" <br />91 GAS TURBINE CONTAINMENT - VIEW ELEVATION <br />37 <br />56 <br />42" WATERTIGHT <br />MANHOLE8 <br />41 <br />SUMP SENSOR, INSTALL AT <br />LOWEST POINT TO ENSURE <br />LIQUID DETECTION AT <br />EARLIEST POSSIBLE MOMENT <br />OPW WATERTIGHT FRP LID34 <br />5 <br />79 <br />SUMP INTERSTITIAL MONITORING, BRINE <br />FIBERGLASS CONTAINMENT SUMP TO TANK <br />COLLAR INSIDE AND OUT TO INSURE <br />WATER TIGHTNESS <br />BRAVO TEST PORT, WITH HOSE AND TEST <br />CONNECTION CAP. <br />79 <br />36 <br />BARBED FITTINGS <br />VACUUM HOSE <br />55 <br />57 <br />79A <br />SCALE:3/4" = 1'-0" <br />91 GAS FILL - PLAN VIEW <br />EXTRACTOR FITTING <br />2" F.R.P. VENT LINE MANIFOLD TO <br />VENT LINE FROM 87 FILL SUMP <br />SUMP PENETRATION BOOT <br />3" BELLxMALE F.R.P. <br />THREADED ADAPTOR <br />3"x12" FLEXIBLE CONNECTOR <br />MALE SWIVELxMALE <br />COUPLING <br />42" MULTIPORT MANHOLE <br />48"Ø F.R.P. CONTAINMENT SUMP <br />WITH REDUCING LID <br />55 <br />8 <br />ELECT PENETRATION <br />BOOT <br />3" OV 2" FOR <br />MONITORING AND <br />ELECT & VACUUM. <br />TO TURBIN SUMP. <br />SUMP LIQUID SENSOR <br />INSTALL AT LOWEST POINT TO <br />ENSURE LIQUID DETECTION AT <br />EARLIEST POSSIBLE MOMENT <br />79 <br />6 <br />33 <br />26 <br />BRINE <br />SENSOR. <br />27 <br />3" F.R.P. VAPOR LINE <br />FILL <br />56 <br />55 <br />56 <br />79 <br />55 <br />56 <br />28 <br />8 <br />10 <br />9 <br />2" F.R.P. VENT LINE <br />SCALE:3/4" = 1'-0" <br />87 FILL SUMP - PLAN VIEW <br />EXTRACTOR FITTING <br />2" BELLxMALE F.R.P. <br />THREADED ADAPTOR <br />3" F.R.P. VAPOR LINE <br />SUMP PENETRATION BOOT <br />2" BELLxMALE F.R.P. <br />THREADED ADAPTOR <br />2" 90° STEEL ELBOW <br />PENETRATION BOOT <br />3"x12" FLEXIBLE CONNECTOR <br />MALE SWIVELxMALE <br />COUPLING <br />COUPLING <br />42" MULTIPORT MANHOLE <br />48"Ø F.R.P. CONTAINMENT SUMP <br />WITH REDUCING LID <br />55 <br />26 <br />33 <br />24 <br />SUMP PAN LIQUID SENSOR, <br />INSTALL AT LOWEST POINT TO <br />ENSURE LIQUID DETECTION AT <br />EALIEST POSSIBLE MOMENT <br />79 <br />55 <br />3" OV 2" FOR <br />MONITORING AND <br />ELECT & VACUUM. <br />TO TURBIN SUMP. <br />VACUUM LINE <br />55 <br />6 <br />SUMP INTERSTIAL <br />BRINE SENSOR <br />79 <br />28 <br />FILL <br />TLM <br />56 <br />56 <br />56 <br />27 <br />8 <br />DETAILS <br />FIBERGLASS CONTAINMENT <br />SUMP TO TANK COLLAR INSIDE <br />AND OUT TO INSURE WATER <br />TIGHTNESS <br />8 <br />42" MULTIPORT MANHOLE <br />W/ LIQUID TIGHT & VAPOR <br />TIGHT FILL BOX <br />4" SCH. 40 GALVANIZED RISER <br />PRIMED AND WRAPPED <br />CONTAINMENT SUMP <br />SUMP SHIELD <br />JUNCTION BOX (EXPLOSION <br />PROOF) <br />SUMP PENETRATION BOOT <br />3/4" CONDUIT TO TURBINE <br />SUMP JUNCTION BOX <br />EXTRACTOR FITTING <br />3" OVER 2" F.R.P. VENT LINE <br />2" BELLxMALE F.R.P. <br />THREADED ADAPTOR <br />27 <br />USE OPW RISER SUPPORT BRACKETS (BRACELETS) <br />NOTES: <br />STEEL PLATE AT TANK BOTTOM <br />4" ALUMINUM FILL TUBE w/ <br />POSITIVE SHUT OFF DEVICE: <br />INSTALL AT 95% OF TANK <br />CAPACITY <br />SCALE:3/4" = 1'-0" <br />87 GAS FILL SUMP: FILL, VAPOR, AND VENT DETAIL <br />21 <br />79 <br />1811 <br />13 <br />5 <br />12 <br />VAPOR BUCKET WITH NO DRAIN <br />2" IN 3" CONDUIT PRESSURE LINE <br />TO TURBINE SUMP, PRIMARY LINE <br />OPEN FOR ELECT OR MONITOR <br />WIRES. <br />LIQUID SENSOR INSTALL AT <br />LOWEST POINT TO ENSURE <br />LIQUID DETECTION AT EARLIEST <br />POSSIBLE MOMENT <br />74 <br />BRINE INTERSTITIAL MONITORING <br />55 <br />FILL BUCKET WITH DRAIN <br />18 FACE SEAL ADAPTER <br />79 <br />INSTALL DOUBLE WALLED <br />FIBERGLASS CONTAINMENT SUMP <br />TO AB2481 STANDARD <br />3"x12" FLEX CONNECTOR33 <br />BRINE FILL PORT <br />26 <br />TANK LEVEL MONITOR & <br />LEAK DETECTOR <br />PERPENDICULAR PENETRATIONS OF CONTAINMENT SUMPS <br />PREFERRED. 15° MAXIMUM ALLOWABLE PENETRATION <br />ANGLE.USE SUMP PENETRATION BOOTS AT ALL PENETRATIONS OF <br />SUMP. <br />ALL JUNCTION BOXES ARE TO BE PLACED WITHIN 1'-0" OF THE TOP OF <br />SUMP. <br />4" TOP SEAL ADAPTOR & CAP <br />FUEL SWIVEL ADAPTOR <br />4" TOP SEAL VAPOR <br />& VENT CAP <br />VAPOR SWIVEL ADAPTOR <br />28 <br />56 <br />SCALE:3/4" = 1'-0" <br />87 GAS TURBINE SUMP PLAN VIEW <br />EXPLOSION PROOF <br />JUNCTION BOX <br />SUMP SENSOR, INSTALL AT LOWEST <br />POINT TO ENSURE LIQUID DETECTION <br />AT EARLIEST POSSIBLE MOMENT <br />2"x18" FLEXIBLE CONNECTOR <br />MALE BY MALE SWIVEL <br />3"x2" BOOT WITH TEST PORT <br />2" SCH. 40 FRP. BELL x FEMALE <br />THREADED ADAPTER <br />1" CONDUIT TO INTRINSICALLY <br />SAFE GUTTER AT MONITOR <br />CONTROL PANEL (1 PER TANK) <br />3/4" CONDUIT TO TLM 79 <br />3" OVER 2" PRODUCT, <br />TO DISPENSERS <br />DOUBLE WALL <br />CONTAINMENT SUMP <br />TURBINE PUMP <br />2" BALL VALVE (MAKE HANDLE <br />ACCESSIBLE FROM GRADE) <br />LEAK DETECTOR <br />42 <br />3/4" CONDUIT FOR PUMP POWER <br />TO ELECT. PANEL -1 PER TANK <br />42" WATERTIGHT MANHOLE8 <br />41 <br />36 <br />BRINE <br />INTERSTITIAL SENSOR <br />VACUUM SENSOR <br />AND HOSE 80 <br />USE SIPHON JET PORT FOR <br />VACUUM GENERATION <br />5CHECK VALVE FOR <br />LEAK DETECTOR <br />79 <br />37 <br />81 <br />38 <br />57 <br />TURBINE PUMPJUNCTION BOX <br />(EXPLOSION PROOF) <br />PENETRATION BOOT <br />THIS PIPE TO FILL SUMP <br />3/4" CONDUIT TO ELECT. <br />PANEL (PUMP POWER) <br />1" CONDUIT TO INTRINSICALLY <br />SAFE GUTTER AT MONITOR <br />CONTROL PANEL (1 PER TANK) <br />3/4" CONDUIT TO FILL/ VAPOR <br />SUMP JUNCTION BOX <br />CONTAINMENT SUMP REDUCER, <br />FIBERGLASS REDUCER ON THE <br />OUTSIDE TO ENSURE WATER <br />TIGHTNESS <br />2"x18" FLEXIBLE CONNECTOR <br />MALE BY MALE SWIVEL <br />SCALE:3/4" = 1'-0" <br />87 GAS TURBINE CONTAINMENT - VIEW ELEVATION <br />56 <br />42" WATERTIGHT MANHOLE8 <br />41 <br />SUMP SENSOR, INSTALL AT <br />LOWEST POSSIBLE POINT TO <br />ENSURE LIQUID DETECTION AT <br />EARLIEST POSSIBLE MOMENT <br />OPW WATERTIGHT FRP LID34 <br />5 <br />79 <br />79 <br />BRINE SUMP INTERSTITIAL <br />MONITORING <br />FIBERGLASS CONTAINMENT <br />SUMP TO TANK COLLAR INSIDE <br />AND OUT TO INSURE WATER <br />TIGHTNESS <br />37 <br />TEST PORT, WITH HOSE & TEST <br />CONNECTION CAP. <br />36 <br />55 <br />BARBED FITTINGS <br />VACUUM HOSE <br />57 <br />79A <br />18 <br />SCALE:3/4" = 1'-0" <br />TANK INTERSTITIAL MONITOR-VEEDER-ROOT <br />ELECTRICAL JUNCTION BOX <br />18" MANHOLE <br />78 <br />3/4" CONDUIT <br />4" SCHEDULE 40 PIPE <br />BRINE INTERSTITIAL SENSOR <br />12 <br />NOTE: <br />THE TANK AND THE TANK SUMPS HAVE CALCIUM CHLORIDE IN THE <br />INTERSTITIAL SPACE. <br />CONTRACTOR TO LABEL FILL PORTS WITH TYPE OF FILL. <br />SEE DETAIL 18/FS5SEE DETAIL 18/FS5 <br />NOTE:8""4"CL <br />#4 REBAR AT 24" O.C. EACH <br />WAY (TYPICAL)6"SCALE:1"=1'-0" <br />TANK SLAB DETAIL <br />PEA GRAVEL, DEPTH VARIES. <br />SEE SITE PLAN FOR SPECIFIC <br />APPLICATIONMIN <br />11 <br />7 <br />11 11