Laserfiche WebLink
<br />John Lane, PG <br />Condor EarthOffice: 209-938-1061 <br />Mobile: 209-743-7443 <br />jlane@condorearth.com <br /> <br />From: Nathan Gustus <nate.gustus@sitelogiq.com> <br />Sent: Tuesday, September 10, 2024 11:40 AM <br />To: John Lane <jlane@condorearth.com>; Luke Castle <lcastle@condorearth.com> <br />Subject: RE: Riverbank WWTP Soil Sampling <br /> <br />Hi John, <br /> <br />Thanks for the email. It sounds like we really don’t have too many toxic substances to deal with <br />here, which is a great thing. <br /> <br />You’re still waiting on additional results and also the results from the dioxin/furan and asbestos <br />analysis right? When do you think you’ll be getting those? <br /> <br />And once your receive those results, you’ll be sending a report to us right? How much time will you <br />need for that? <br /> <br />What is the total cost now for the additional permitting, permitting fee, and the dioxin/furan and <br />asbestos analysis? <br /> <br />Nate <br /> <br />Nathan​​​​ Gustus |Sr. Project Manager |M: 916.693.7140 <br /> <br />From: John Lane <jlane@condorearth.com> <br />Sent: Friday, September 6, 2024 12:12 PM <br />To: Nathan Gustus <nate.gustus@sitelogiq.com>; Luke Castle <lcastle@condorearth.com> <br />Subject: RE: Riverbank WWTP Soil Sampling <br /> <br />CAUTION: This is an external email. DO NOT click links or open attachments unless you recognize the sender and <br />know the content is safe. <br /> <br />Hi Nate: <br /> <br />We received our first lab report for our Day 1 sampling. Without a detailed evaluation, looks like for <br />composites DP-1 through : <br /> <br />metals are within background thresholds in Samples DP-1 through DP-10 (requested <br />corrected lab, which reported DP-2 as DP-L)