Laserfiche WebLink
JONES COVEY R UP, INC. <br /> COMPLETE FUEL SYSTEM CONSTRUCTIONEt MAINTENANCE SERVICES <br /> VOLUMETRIC LINE TIGHTNESS TIEST <br /> SITE: PilGt Flying J. Ripon DATE: u s 19 2 n 2 5 <br /> Site Address CONTACT: Site Manager <br /> 1501 North Jack Ton Road,Rlpan Ca 953E PHONE- 209 599-4141 <br /> 106 ##: 2488940-1 <br /> Test Number <br /> Sump Plump 9 1 2&3 <br /> Product Diesel Diesel <br /> Piping Type Fiberglass FJberglass <br /> Piping Manufacturer NOVNOV <br /> Turbine Manufacturer Red-Jacket Red Jacket <br /> Isolation (pump) Ball Valve Bail Valve <br /> Isolation (dis .) TransWan5ump=Sal I Valve TrunslVon5ump-QallValve. <br /> Test Pressure 55 PSI 55 PSI <br /> Initial Cyl. Level 360ML 29UML <br /> Final CyL Level 270ML 294ML <br /> Begin Time 9:25em 9:25am <br /> End Time 9:40am 9:40am <br /> Change In Timm, 15 Minutea 15 Minutes <br /> Change In Volume 10 ML a ML <br /> Leak Rate O.DiGPH O.00 GPH <br /> Pass/Fail Pass Pass <br /> Line Test Method Volmmetric Volumetric <br /> Cornments; <br /> Tarik#2&3 lines were tested together, bosh lines are manifolded fnto 1 line inside Bio-Shed. <br /> Technician.Arturo Perez License Number Tank Tester#1767 Exp:08-31-2026 <br /> Signature <br /> fit a TEI-LT-3 l ort#TMI-148 Exp:01-13-2028 <br /> 9595 Lucas Ranch Rd= 4100 Rancho Cucamonga,CA 91730 <br /> Office (888)97Z-7581 Fax(909) 484-030D Fax California 5tzte License 0 804431 A,B,HAZ <br />