My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
1501
>
2300 - Underground Storage Tank Program
>
PR0505264
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2026 10:13:01 PM
Creation date
1/6/2025 4:11:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0505264
PE
2361 - UST FACILITY
FACILITY_ID
FA0006672
FACILITY_NAME
FLYING J TRAVEL PLAZA #618*
STREET_NUMBER
1501
Direction
N
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
22811017
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
1501 N JACK TONE RD RIPON 95366
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
503
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Rewrrrnended Practices for the'restini and Verifkatinn of Spill,Overfill,Leak detection and Secondary Containment frtuipment at UST F rflltllrs <br /> ing requiremenu stared in this =rni xnded pracEice ale <br /> general StdteInent6 and may vary. RcExllrllt7e11rlcd p1r-g- S. SPILL BUCKET AND <br /> sure levels Lwd test dt[raticros am aditss,%d in Section 5.7. CONTAINMENT SUMP <br /> Piping rnanufacturem, lest procedures May differ, TESTING <br /> This test can be conducted in sectiont4 or as one con- <br /> thivo4 is pipe depondtg an the insEaIlaTion, Care should he 6.1 General. Spill buckets and cuntairn iimt SUMPS for <br /> taken to ensure that the entire secondary containment oi' imik 9y5-,IumS are neilher intended nor deaipned for the <br /> the piping sysLem is tr-stud, storage of petroleum products, but rather to enntsin gniaf t <br /> 6.6 Test Equipment, 7est equipment shall include: leaks and spills for short periods of time. This section <br /> dt:f rihcs dice lxmeedurea wed to test the integrity of spilt <br /> inert gas sour= (nil.rogen, helium,etc.); buckets and uoutai.nuteizt sum pa to trrisure tllat;hey do not <br /> • smpwamh m other unia-measurement devim adpable leak. <br /> of rumstiring II 1-Wound 111=111ent; 6.2 Spill Bucket integrity TOMIng — Hydrostatic <br /> i t tubing wenablieti {TubiQg aastrziNi provide Test Method. <br /> aciccsis to the he-ginning and end of the interstitial <br /> space,); WARNING; Do not use fuels such as gave- <br /> + pressure gauge with a 15 prig maximum pressure read- line, E85 or diesel as a tact fluid because <br /> ing with 01 incmmbnts. they present a serious fire and nafety <br /> hazard. ORsullne vapors are flammable <br /> 5.7 Test Procedure. and can explode if exposed to an ignition <br /> L Tf nccessay. re-install terruina imi (test.) boots at pip- source such as a spark or open flame. If <br /> ing terminations, a tank or cor►talnment area Is not tight, <br /> using feel as the teat fluid will cause a <br /> 2. If lleccsx�ry, connect tile, tubing ussoinbllca to the sec- releelse Irma the sell or g�rounclwe#er. � <br /> ondary containment termination fitting un c iwh end elf <br /> the: smdii n cif lulling to he tt acd. <br /> 3. Connect [fie,inert brag source and pressure gauge, <br /> 4.Gradual I pregsuilze the irt[esstuial space to 5 psig. <br /> Close the valve and atlow ihe. pressure to srah fim. <br /> Rcpmw$l1riYP to tLie.ape cnl<iCdl w8[ prA.6mlrn iI 11cee.gA$ry_ <br /> S.Ohcierve rho pressure for a pariad of I hour. <br /> B.If the piping pjvsaure o ter I hour is lens thall [lie test <br /> pressure,check termivation fittings and tusL�jsscailslic,q <br /> for nestle,S, <br /> T.Release. [he. presmau cmi tht: system slowly. <br /> a. Rcelinve Elie, lest egnipr=111. <br /> 9.Rmtore the piping in hN nornial up crving Londition. <br /> 6-8 Pass/Fall OrReft if no pressure change occurs <br /> during the ttst period, the piping; sysical passes 111C See- <br /> r�n�lary C[rri19it11llC9lt integrity test. FIGURE G-�. The hydrostattc rttetlzact of nl8fertl9IrJfrlg <br /> spi"i bucket fntegrfty useS MW to deteO forks. The <br /> If there ix any drop in pt:ssure Duct` tine test period, [he measudog stick must be placed in the same io allon <br /> piping fair the secondary containment integrity test, at the beg)nn)ng and end of the test period to ensure <br /> If there is any inckLcase in pressure over the teat pc»c+cl. accarate water level readings. <br /> repent the test. <br /> pei.org <br />
The URL can be used to link to this page
Your browser does not support the video tag.