My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
COLEY
>
1812
>
2300 - Underground Storage Tank Program
>
PR0231881
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2026 8:57:28 PM
Creation date
1/13/2025 11:39:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0231881
PE
2371 - UST FACILITY - 1702 COMPLIANT
FACILITY_ID
FA0003946
FACILITY_NAME
AT&T California - UG010
STREET_NUMBER
1812
STREET_NAME
COLEY
STREET_TYPE
AVE
City
Escalon
Zip
95320
APN
22715414
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
1812 Coley AVE Escalon 95320
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 6. TANK SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ❑ Manufacturer 0 Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure El Vacuum ❑ Hydrostatic <br /> Test Equipment Used:4" Dial Gauge <br /> Tank ID 00010u001 <br /> Tank Manufacturer Modern Welding <br /> Tank Capacity 1,000 gal <br /> Test Start Time 9:00am <br /> Initial Reading -10" Hg <br /> Test End Time 10:00am <br /> Final Reading -10" Hg <br /> Change in Reading 0 <br /> Pass/Fail Criteria 0 <br /> 11 Tightness Test Results ❑✓ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> 7. PIPE SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ❑ Manufacturer ❑✓ Industry Standard ❑ Professional Engineer <br /> Test Type ❑✓ Pressure ❑ Vacuum ❑ Hydrostatic <br /> Test Equipment Used: 4" Dial Gauge <br /> Pipe Run ID Supply Secondary Return Secondary Vent Secondary <br /> Pipe Manufacturer Western Fiberglass Western Fiberglass A.O. Smith <br /> Test Start Time 9:00am 9:00am 9:00am <br /> Initial Reading 5 psi 5 psi 5 psi <br /> Test End Time 10:00am 10:00am 10:00am <br /> Final Reading 5 psi 5 psi 5 psi <br /> Change in Reading 0 0 0 <br /> Pass/Fail Criteria 0 0 0 <br /> Tightness Test Results ❑✓ Pass ❑ Fail ❑✓ Pass ❑ Fail ❑✓ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Pipe Run ID <br /> Pipe Manufacturer <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.