My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
COLEY
>
1812
>
2300 - Underground Storage Tank Program
>
PR0231881
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2026 8:57:28 PM
Creation date
1/13/2025 11:39:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0231881
PE
2371 - UST FACILITY - 1702 COMPLIANT
FACILITY_ID
FA0003946
FACILITY_NAME
AT&T California - UG010
STREET_NUMBER
1812
STREET_NAME
COLEY
STREET_TYPE
AVE
City
Escalon
Zip
95320
APN
22715414
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
1812 Coley AVE Escalon 95320
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMP/UDC TEST <br /> Test Method Developed by ❑ Manufacturer p Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacuum ❑ Hydrostatic <br /> Test Equipment Used: omntec cLD <br /> Sump/UDC ID Fill/Piping Sump Vent Box Transition Sump <br /> Sump Manufacturer N/A N/A N/A <br /> Sump Depth (inches) 74" 42" 32" <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration 34" 16" 8° <br /> (inches) <br /> Test Start Time 9:06am 9:42am 10:25am <br /> Initial Reading 9.316 in. 10.423 in. 11.349 in. <br /> Test End Time 9:21am 9:57am 10:40am <br /> Final Reading 9.316 in. 10.423 in. 11.163 in. <br /> Change in Reading 0 in. 0 in. -0.186 in. <br /> Pass/Fall Criteria -+0.002 in. -+0.002 in. -+0.002 in. <br /> Tightness Test Results p Pass ❑ Fail p Pass ❑ Fail ❑ Pass p Fail ❑ Pass ❑I Fail <br /> Sump/UDC ID <br /> Sump Manufacturer <br /> Sump Depth (inches) <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> ass Fail Criteria <br /> Tightness Test Results ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 3 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.