Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMP/UDC TEST ' .. <br /> Test Method Developed by ❑ Manufacturer ® Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacuum ® Hydrostatic <br /> Test Equipment Used: <br /> Sump1UDC ID 87 STP 91 STP Diesel STP <br /> Sump Manufacturer <br /> Sump Depth (inches) <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 10:39 12:28 12:30 <br /> Initial Reading 6.0039 4.9389 6.4480 <br /> Test End Time 10:54 12:43 12:45 <br /> Final Reading 6.0027 4.9390 6.4482 <br /> Change in Reading 0.0012 0.0001 0.0002 <br /> Pass/Fail Criteria 0.002 0.002 0.002 <br /> Tightness Test Results ® Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail ❑ Pass ❑ Fail <br /> Sump/UDC ID 87 Fill 91 FIII Diesel Fill <br /> Sump Manufacturer <br /> Sump Depth (inches) <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 9:46 9:06 8:26 <br /> Initial Reading 5.1788 4.6372 6.8967 <br /> Test End Time 10:00 9:21 8:41 <br /> Final Reading 5.1790 4.6371 5.8967 <br /> Change in Reading 0.0002 0.0001 0 <br /> Pass/Fail Criteria 0.002 0.002 0.002 <br /> Tightness Test Results ® Pass ❑ Fail ® Pass ❑ Fail N Pass ❑ Fail ❑ Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked"Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 3 of 5 <br />