Laserfiche WebLink
CGRS <br /> SOLUTIONS DELIVERED <br /> update the parts list on page 3 to include manufacturer and models for all regulated parts being <br /> used. I want to make sure I approve you for the right stuff. <br /> Page 3 of 6: <br /> • install 208 in turbine sump (Veeder-Root) -208 diesel sensor was installed by previous <br /> contractor during the 2024 inspection without a finalized permit <br /> • install diesel mechanical leak detector(Vaporless) <br /> • install 91 spill bucket (OPW) -diesel spill bucket was tested and passed the 2025 monitor <br /> certification without breaking ground <br /> Written letter: <br /> • install Veeder-Root 409 sensor in diesel/E85 tank annular -plans should read 345 sensor <br /> is installed, see attached site map <br /> • Veeder-Root 208 sensor in turbine sump (diesel turbine sump) <br /> • pull back test boot in E85 turbine sump completed at monitor cert on 1-24-25 <br /> • replace diesel leak detector—not needed leak recent <br /> • replace 91 spill bucket (like for like) Spill bucket passed testing without replacement <br /> Map: new map attached <br /> • install Veeder-Root 345 sensor in diesel/E85 tank annular -to compound this issue the <br /> original sensor was the correct 345 sensor and passed the 2025 inspection <br /> • obtain permit for Veeder-Root 208 replacement in diesel turbine sump with revised <br /> SOW <br /> • pull back test boot on E85 product line in turbine sump -completed at 2025 inspection <br /> • install new VMI LD-2000 leak detector on diesel turbine - not needed leak detector <br /> passed testing without replacement <br /> • install new OPW diesel spill bucket—not needed <br /> 2. The leak detector is listed as the VMI LD-2000, but the cut sheet submitted is for the VMI 99 LD- <br /> 2000. Which part will be used? -VMI -LD 2000 is correct <br /> 3. No cut sheet was submitted for the diesel/E85 annular sensor. Please submit a cut sheet and <br /> E85 compatibility information. 345 cut sheet attached <br /> 4. The VMI certification submitted was for operation of the tester box. No certification was <br /> submitted for installation of the leak detector. Please submit a VMI installer certification for <br /> Richard Thomas, or full certifications for another service technician. Garret Warren performed <br /> the leak detector certification during the 2025 inspection, ICC& manufacture certs attached <br /> CGRS's Revised Scope of Work-replace the 208 e85 turbine sump sensor with a 323 sensor&submit <br /> permit application for the diesel 208 turbine sump sensor, see attached SOW&Site Plan. <br /> Please call or email me should you have any further questions regarding this Response Letter. <br /> Submitted by: CGRS, Inc. <br /> CGRS, Inc. 5444 Dry Creek Rd. <br /> Sacramento, California 95838 <br /> A"OeT 76w" Cell (626-627-8316) <br /> Matt Thomas State of CA Contractors License #803616 <br />