Laserfiche WebLink
Underground Storage Tank <br /> Overfill Prevention Equipment Inspection Report <br /> 6. OVERFILL PREVENTION EQUIPMENT DETAILS <br /> Tank ID (one OPE per column) 87 91 Diesel <br /> Are both vent and tank riser piping M Yes Iāœ“ Yes [7/1 Yes El Yes <br /> secondarily contained? © No M No 0 No 0 No <br /> OPE Model EBw EBw EBw <br /> What is the OPE response when Shut off Shut off Iāœ“ Shut off Shut off <br /> activated? Flow Flow Flow Flow <br /> (Check all that apply.) Restricts ORestricts © Restricts Restricts <br /> Flow Flow Flow Flow <br /> Audible 0 Audible © Audible Audible <br /> Alarm Alarm Alarm Alarm <br /> 0 Visual Q Visual Visual Visual <br /> Alarm Alarm Alarm Alarm <br /> Are flow restrictors installed on vent piping i-- Yes* 0 Yes* Yes* Yes* <br /> that may interfere with the OPE operation? i7 No No 7 No f- No <br /> At what level in the tank is the OPE set to <br /> 103.75" 79.25" 79.25" <br /> activate? Inches from bottom of tank <br /> What is the percent capacity of the tank at <br /> 94% 94% 94% <br /> which the OPE activates? <br /> Is the OPE in proper operating condition to M Yes Yes* El Yes* Yes* <br /> respond when the stored substance No © No © No 0 No <br /> reaches the designated regulatory level? <br /> 7. SUMMARY OF TESTING RESULTS <br /> OPE Inspection Results āœ“ Pass Pass Pass Pass <br /> Fail 0 Fail 0 Fail Fail <br /> 8. COMMENTS <br /> Describe all answers marked "No" or"Fail"and proposed remedy. <br /> List all monitoring equipment either replaced or repaired. <br /> Completed on SR0087996. <br /> * Mark here if: <br /> © Flow restrictors interfere with overfill prevention and equipment repairs required. <br /> Additional copies of this page may be attached. <br /> Attach tank chart(s), measurements, calculations, and In-Tank Setup report(s) <br /> Page 2 of 2 <br />