My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
1901
>
2900 - Site Mitigation Program
>
PR0548085
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 9:28:48 AM
Creation date
1/30/2025 12:25:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0548085
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0027434
FACILITY_NAME
SINCLAIR DINO MART
STREET_NUMBER
1901
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
1901 S EL DORADO ST STOCKTON 95206
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
between 39 feet bgs and 109 feet bgs. Total purgeable gasoline range petroleum hydrocarbons <br /> (TPPH) were detected in grab groundwater samples collected from CPT9, CPT10 and CPT12 <br /> locations at concentrations ranging from 800 ug/l (CPT12-105) to 7,000 ug/l (CPT9-70). <br /> Petroleum hydrocarbons were not detected in grab groundwater samples collected from the <br /> CPT 11 hydropunch boring location (FREY, 2023). Hydropunch groundwater sample analytical <br /> results are summarized in Table 2. <br /> GROUNDWATER MONITORING AND SAMPLING(2004—2023) <br /> Quarterly or semi-annual groundwater monitoring and sampling was conducted by AGE from <br /> the first quarter 2004 through the third quarter 2018. FREY resumed semi-annual groundwater <br /> monitoring and sampling in the first quarter 2021. Based on groundwater monitoring data <br /> collected by FREY between the third quarter 2021 and the first quarter 2023, the direction of <br /> groundwater in the shallower-screened monitoring wells has ranged between south-south <br /> westerly and southeasterly. The direction of groundwater flow in the deeper-screened wells (75- <br /> 80 feet) has been east-northeasterly. Sketches showing groundwater elevations and estimated <br /> directions of groundwater flow in shallower screened (20' - 55') and deeper screened (75' — 80' <br /> and 95' — 105') wells measured during the first quarter 2023 groundwater monitoring and <br /> sampling event are presented in Figures 4 and 5, respectively. A rose diagram incorporating <br /> shallow screened and deeper screened wells for flow direction estimates are presented on Figures <br /> 6 and 7, respectively. <br /> Sketches showing TPPH and benzene in groundwater from the first quarter 2023 groundwater <br /> monitoring and sampling event are presented in Figures 8 through 11. Historical groundwater <br /> analytical data is summarized in Table 3. <br /> OBJECTIVE <br /> The objective of the scope of work outlined below is to further assess the lateral and vertical <br /> extent of petroleum hydrocarbons in groundwater to the north and northeast of groundwater <br /> monitoring well MW-14 and CPT12, and south of groundwater monitoring well MW-12 and <br /> CPT-9. <br /> SCOPE OF WORK <br /> The scope of work designed to meet the objective will include the following tasks: <br /> • Acquire an encroachment permit from the City of Stockton. <br /> • Acquire drilling permits from the San Joaquin County Environmental Health Department <br /> (SJCEHD). <br /> • Mark boring locations for Underground Service Alert (USA) notification and retain a <br /> licensed utility location contractor to identify and mark detectable utilities. <br /> • Prepare a Site-Specific Health and Safety Plan. <br /> • Schedule a drilling subcontractor and notification of the Agencies having jurisdiction to <br /> inspect work. <br /> • Advance one hydropunch boring (HP I) and collect a groundwater sample at approximately <br /> 120 feet bgs, approximately 200 feet northeast of CPT12. <br /> FREY Environmental,Inc. 7 Project No. 1095-01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.