My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3725
>
2300 - Underground Storage Tank Program
>
PR0231417
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2026 8:22:01 PM
Creation date
3/4/2025 11:38:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0231417
PE
2361 - UST FACILITY
FACILITY_ID
FA0003780
FACILITY_NAME
TRACY SHELL
STREET_NUMBER
3725
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
21217030
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
3725 N TRACY BLVD TRACY 95376
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 6. TANK SECONDARY CONTAINMENT TEST <br /> Test Method Developed by 0 Manufacturer © Industry Standard © Professional Engineer <br /> Test Type El Pressure Vacuum Hydrostatic <br /> Test Equipment Used: VACUUM GAUGE <br /> Tank ID <br /> Tank Manufacturer <br /> Tank Capacity <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> 11 Tightness Test Results 0 Pass 0 Fail 0 Pass 0 Fail 0 Pass 0 Fail 0 Pass 0 Fail <br /> 7. PIPE SECONDARY CONTAINMENT TEST <br /> Test Method Developed by 0 Manufacturer F] Industry Standard 0 Professional Engineer <br /> Test Type 0 Pressure © Vacuum 0 Hydrostatic <br /> Test Equipment Used: PRESSURE GAUGE <br /> Pipe Run ID 87 WEST 87 EAST 91 DSL. <br /> Pipe Manufacturer SMITH SMITH SMITH SMITH <br /> Test Start Time 9:10 9:10 9:10 9:10 <br /> Initial Reading 5 PSI 5 PSI 5 PSI 5 PSI <br /> Test End Time 10:10 10:10 10:10 10:10 <br /> Final Reading 5 PSI 5 PSI 5 PSI 5 PSI <br /> Change in Reading 0 0 0 0 <br /> Pass/Fail Criteria 0 0 0 0 <br /> Tightness Test Results 0 Pass 0 Fail E Pass r Fail F Pass 0 Fail 0 Pass Fail <br /> Pipe Run ID <br /> Pipe Manufacturer <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results 0 Pass Ej Fail 0 Pass 0 Fail 0 Pass 0 Fail 0 Pass 0 Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail'and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.