Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 9. COMMENTS <br /> BRAVO ENTRIES WERE INSTALLED ON ALL GAS UDC'S AND THE 87 EAST STP DUE TO <br /> PREVIOUS SB989 FAILURES. ALL REQUIRED SB989 WAS COMPLETED ALONG WITH THE <br /> PREVIOUS FAILURES WAS COMPLETED TODAY AND ALL EQUIPMENT TESTED PASSED. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 5 of 5 <br />