My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
520
>
2800 - Aboveground Petroleum Storage Program
>
PR0528294
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2025 11:08:02 AM
Creation date
3/7/2025 4:04:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0528294
PE
2832 - AST FAC 10 K - </=100 K GAL CUMULATIVE
FACILITY_ID
FA0009384
FACILITY_NAME
CITY OF TRACY BOYD SERVICE CTR
STREET_NUMBER
520
Direction
S
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
23538001
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\bmascaro
Supplemental fields
Site Address
520 S TRACY BLVD TRACY 95376
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The following is an itemized list of CP22 - AST Non-Qualified violations that have not <br />been addressed for CITY OF TRACY BOYD SERVICE CTR as of May 16, 2025. <br />Open violations from February 25, 2025 inspection <br />Violation #7 - 4010010 - Facility has amended SPCC as necessary. <br />OBSERVATION: The facility failed to amend the Spill Prevention, Control, and Countermeasure (SPCC) Plan within six <br />months of when there was a change in design, construction, operation, or maintenance, which affects the facility’s <br />discharge potential. Observed section 3.2 of the SPCC plan internal notification table needed updating to include <br />Adrian Taylor who has been their Environmental Contact for two years and remove Frank DeSousa , Fleet Supervisor - <br />Secondary Emergency Contact who left the company more than six months ago. <br />REGULATION GUIDANCE: (a) Amend the SPCC Plan for your facility in accordance with the general requirements in <br />§ 112.7, and with any specific section of this part applicable to your facility, when there is a change in the facility <br />design, construction, operation, or maintenance that materially affects its potential for a discharge as described in § <br />112.1(b). <br />CORRECTIVE ACTION: Ensure that the SPCC Plan has been amended, as required, and it accurately represents <br />facility design, procedures, and policies currently in place. Provide proof of correction to the EHD. <br /> <br />Describe actions taken or will be taken to correct violation: <br />¨ This violation will be corrected by (date): ¨ This violation was corrected <br />¨ Supporting documents included <br />Violation #10 - 4010009 - 5 year review performed on SPCC and documented. <br />OBSERVATION: The facility failed to perform the 5-year review of the SPCC plan. The Spill Prevention, Control, and <br />Countermeasure (SPCC) Plan was last reviewed on October 22, 2018. <br />REGULATION GUIDANCE: (b) Notwithstanding compliance with paragraph [112.5] (a) of this section, complete a <br />review and evaluation of the SPCC Plan at least once every five years from the date your facility becomes subject to <br />this part; or, if your facility was in operation on or before August 16, 2002, five years from the date your last review was <br />required under this part. As a result of this review and evaluation, you must amend your SPCC Plan within six months <br />of the review to include more effective prevention and control technology if the technology has been field -proven at the <br />time of the review and will significantly reduce the likelihood of a discharge as described in § 112.1(b) from the facility. <br />You must implement any amendment as soon as possible , but not later than six months following preparation of any <br />amendment. You must document your completion of the review and evaluation , and must sign a statement as to <br />whether you will amend the Plan, either at the beginning or end of the Plan or in a log or an appendix to the Plan. The <br />following words will suffice , “I have completed review and evaluation of the SPCC Plan for (name of facility) on (date), <br />and will (will not) amend the Plan as a result.” <br />CORRECTIVE ACTION: Immediately complete and document the 5-year review of the SPCC Plan and make any <br />necessary amendments (a Professional Engineer must certify any technical amendments). Submit verification of <br />adequate SPCC plan review completion to the EHD. <br /> <br />Page 1 of 5
The URL can be used to link to this page
Your browser does not support the video tag.