Laserfiche WebLink
The following is an itemized list of CP22 - AST Non-Qualified violations that have not <br />been addressed for CITY OF TRACY BOYD SERVICE CTR as of May 16, 2025. <br />Open violations from February 25, 2025 inspection <br />Describe actions taken or will be taken to correct violation: <br />¨ This violation will be corrected by (date): ¨ This violation was corrected <br />¨ Supporting documents included <br />Violation #32 - 4020002 - Spill prevention briefings are conducted annually. <br />OBSERVATION: Failure to conduct spill prevention briefing for oil-handling personnel at least once a year to assure <br />adequate understanding of the SPCC Plan, including: <br />1. Known discharges or failures. <br />2. Malfunctioning components. <br />3. Any recently developed precautionary measures. Failure to provide copies of annual spill prevention briefings. <br />Training records for the last three years were not available during inspection . <br />REGULATION GUIDANCE: (f)(3) Schedule and conduct discharge prevention briefings for your oil-handling personnel <br />at least once a year to assure adequate understanding of the SPCC Plan for that facility. Such briefings must highlight <br />and describe known discharges as described in § 112.1(b) or failures, malfunctioning components, and any recently <br />developed precautionary measures. <br />CORRECTIVE ACTION: Discharge prevention briefings for oil handling personnel must be scheduled and conducted at <br />least once a year to assure adequate understanding of the SPCC Plan for that facility. Conduct all required spill <br />prevention briefings. Provide compliance verification to the EHD. <br /> <br />Describe actions taken or will be taken to correct violation: <br />¨ This violation will be corrected by (date): ¨ This violation was corrected <br />¨ Supporting documents included <br />Page 2 of 5