My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LINCOLN
>
907
>
2300 - Underground Storage Tank Program
>
PR0231871
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2026 8:31:38 PM
Creation date
4/1/2025 1:58:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0231871
PE
2361 - UST FACILITY
FACILITY_ID
FA0003968
FACILITY_NAME
AT&T California - UE046
STREET_NUMBER
907
Direction
W
STREET_NAME
LINCOLN
STREET_TYPE
RD
City
Stockton
Zip
95207
APN
07747007
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
907 W Lincoln RD Stockton 95207
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
188
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S A N 9 J O f l V I N <br />COUNTY <br />SCOPE OF WORK <br />Environmental Health Department <br />REQUIRED PERMIT TYPE <br />PIPING <br />Primary piping repair or replacement above the shear valve <br />(6) No UST Retrofit Permit Needed <br />Buried primary or secondary piping repair, replacement, relocation, or <br />installation downstream of the shear valve, including replacement of buried <br />flex connectors <br />(3) UST Retrofit - Full Permit <br />Primary or secondary piping repair or replacement fully inside a sump, <br />including flex connectors <br />(4) UST Retrofit - Minor Plan Check <br />Vent or vapor recovery piping repair or replacement for tanks installed prior <br />to 7/1/03 <br />(6) No UST Retrofit Permit Needed <br />MONITORING SYSTEM (PANELS, SENSORS & LEAK DETECTORS) <br />Installation of new sensor or leak detector (not a replacement) <br />(3) UST Retrofit - Full Permit <br />Sensor or leak detector replacement - not "like for like" <br />(4) UST Retrofit - Minor Plan Check <br />Sensor or leak detector replacement - "like for like" <br />*look -alike sensors from different manufacturers are not considered 'like for like" <br />(5) UST Retrofit - No Fee Permit <br />Sensor disconnection and reconnection of same sensor, including replacing <br />wiring <br />(6) No UST Retrofit Permit Needed <br />2 to 1 sensor input box replacement <br />(5) UST Retrofit - No Fee Permit <br />Leak detector copper vent tube replacement <br />(6) No UST Retrofit Permit Needed <br />Cold start of monitoring panel <br />(5) UST Retrofit - No Fee Permit <br />Monitoring panel software upgrade with no cold start needed <br />(6) No UST Retrofit Permit Needed <br />Monitoring panel module replacement — when connected to leak detection <br />sensors <br />(5) UST Retrofit - No Fee Permit <br />Monitoring panel replacement - "like for like" with existing sensors <br />(5) UST Retrofit - No Fee Permit <br />Monitoring panel replacement - not "like for like" with existing sensors <br />(4) UST Retrofit - Minor Plan Check <br />Monitoring panel replacement - not "like for like" with new sensors <br />(3) UST Retrofit - Full Permit <br />Monitoring panel light bulb or keypad replacement <br />(6) No UST Retrofit Permit Needed <br />Hangar/sleeve installation for positioning of a sensor — not attached to sump <br />wall, opening for liquid entry at the bottom <br />(6) No UST Retrofit Permit Needed <br />Hangar/sleeve installation for positioning of a sensor — glued to sump wall <br />(4) UST Retrofit - Minor Plan Check <br />Hangar/sleeve installation for positioning of a sensor - with holes drilled in <br />sump wall <br />(3) UST Retrofit - Full Permit <br />Vacuum or brine sensor communication repair, when no secondary <br />containment modification or repair is needed <br />(4) UST Retrofit - Minor Plan Check <br />Epoxy pack replacement for existing wire connections <br />(6) No UST Retrofit Permit Needed <br />Electrical junction box replacement, repair, or installation <br />(6) No UST Retrofit Permit Needed <br />Emergency Stop (E-stop) replacement — contact the local fire agency <br />(6) No UST Retrofit Permit Needed <br />RELAY SWITCH/CONTROLLER <br />Relay switch repair or replacement, if used for positive shutdown <br />(5) UST Retrofit - No Fee Permit <br />Relay switch repair or replacement, if not used for positive shutdown <br />(6) No UST Retrofit Permit Needed <br />Replacement/installation of MagVFC variable speed controllers at sites with <br />PLLDs <br />(6) No UST Retrofit Permit Needed <br />OVERFILL PREVENTION <br />Overfill prevention equipment installation, repair, or replacement <br />(3) UST Retrofit - Full Permit <br />Tank probe replacement when not used for overfill prevention <br />(6) No UST Retrofit Permit Needed <br />Float replacement on tank probe when probe is used for overfill prevention <br />(4) UST Retrofit - Minor Plan Check <br />Annunciator/light bulb replacement for external audible/visual for overfill <br />prevention <br />(5) UST Retrofit - No Fee Permit <br />3 of 4 REVISED 7/24/2025 <br />
The URL can be used to link to this page
Your browser does not support the video tag.