Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMP/UDC TEST <br /> Test Method Developed by ❑ Manufacturer 0 Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacuum ED Hydrostatic <br /> Test Equipment Used:INCON TS-STS Tester <br /> Sump/UDC ID 87 STP 91 STP Diesel STP <br /> Sump Manufacturer Fiberglass Fiberglass Fiberglass <br /> Sump Depth (inches) 482 48" 48" <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration 252 23" 23" <br /> (inches) <br /> Test Start Time 9:45 am 9:45 am 9:45 am <br /> Initial Reading 1.6693 5.4319 4.3728 <br /> Test End Time 10:00 am 10:00 am 10:00 am <br /> Final Reading 1.6691 5.4313 4.3726 <br /> Change in Reading 0.0002 0.0006 0.0002 <br /> Pass/Fail Criteria 0.0020 0.0020 0.0020 <br /> Tightness Test Results 0 Pass ❑ Fail 0 Pass ❑ Fail 0 Pass ❑ Fail ❑ Pass ❑ Fail <br /> Sump/UDC ID <br /> Sump Manufacturer <br /> Sump Depth (inches) <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail'and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 3of5 <br />