My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6131
>
2300 - Underground Storage Tank Program
>
PR0231223
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2026 8:05:48 PM
Creation date
4/2/2025 9:00:26 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0231223
PE
2361 - UST FACILITY
FACILITY_ID
FA0002324
FACILITY_NAME
PACIFIC AVE
STREET_NUMBER
6131
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
09746418
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
6131 PACIFIC AVE STOCKTON 95207
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> v <br /> NorCal <br /> Ouelworm.c. <br /> CSLB#1115311 <br /> August 20,2024 <br /> Afzal Ahmadi <br /> Excel Petroleum,Inc. <br /> 6131 Pacific Avenue <br /> Site Number:(209)952-4862 <br /> Cell:(209)221-3502 <br /> Email:excell.p101@gmail.com <br /> Subject:Dispenser Installation with Veeder-Root Cold Start and ISD Rom Upgrade <br /> Scope of Services(SOS): <br /> 1) Submit permit applications to SJVAPCD,SJEHD,for approval.Permits are to be paid by Owner. <br /> 2) Disconnect four(4)3+0 Gilbarco Encore 500s dispensers and set aside for disposal by others. <br /> 3) Disconnect and cap fuel,vapor,and electrical piping. <br /> 4) Disconnect four(4)Assist Vapor Flow meters. <br /> 5) Install Owner provided four(4)Bravo universal conversion plates. <br /> 6) Install four(2)3+0 and(2)3+1 Owner provided remanufactured Gilbarco Encore 700s. <br /> 7) Install piping from existing fuel lines and impact valves to dispensers. <br /> 8) Install piping from existing vapor lines to Balance Vapor Flow Meters. <br /> 9) Pipe and install electrical from existing dispenser junction box. <br /> 10) Purge UST product lines,dispenser product lines,and dispenser fuel meters of air.Calibrate fuel meters and complete <br /> DIMS procedures. <br /> 11) Start up four(4)remanufactured dispensers and configure for EMV. <br /> 12) Cold-Start Monitor Panel and install the following provided by the Owner: <br /> A) ECPU2 with NVMEM if needed. <br /> B) CARB approved ISD ROM software revision 336.02 with ISD version 1.06 per permit conditions. <br /> 13) Grade map all gasoline grades to the ISD module. <br /> 14) Conduct Start-up Source testing of equipment with SJVAPCD. <br /> 15) Conduct Monitor Certification with SJEHD. <br /> 16) Deliver final project documentation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.