Laserfiche WebLink
1 <br />Presto, Carol [EHD] <br />From:tugg@tutamail.com <br />Sent:Friday, May 23, 2025 7:47 AM <br />To:Presto, Carol [EHD] <br />Cc:Heather Macedo. McKenzie <br />Subject:RE: Plant Inspection Due 6-27-2027- Compliance Date Request Signed <br />Attachments:image003.jpg; image004.png; image005.png; image002.jpg; 20250522 Liquid Level <br />Inspection at Stockton A&A.pdf <br />Hi Carol, <br /> <br />Please find attached the inspection and testing letter for the oil tanks at the A&A Concrete Supply, Inc., <br />Stockton Plant. You will find the 5-year review/update requirement is on page 2 of the SPCCP which was <br />certified to be followed by Heather as the Regional Manager in responsible charge. <br /> <br />Hopefully this clears up the last pieces, and thanks for your assistance with the process. Please let us <br />know if there are any outstanding issues to resolve. <br /> <br />Regards, <br /> <br />Matt Tuggle, PE <br />707-365-7440 <br /> <br /> <br />May 20, 2025, 08:00 by cpresto@sjgov.org: <br />Hi Heather, <br /> <br />Thanks for checking in. I need to add your email to my contact list or something because it doesn’t come <br />up. Your email only had #30, #321, #57 but I previously emailed about #10 and #61 as well. <br />#10 – Pending a statement that 5 year reviews of the SPCC Plan will be conducted moving forward. FYI, these 5 <br />year reviews, can be done by A&A Management to verify no updates to the SPCC Plan are needed. <br />#30 – Closed <br />#32 – Closed <br />#57 – Closed <br />#61 – How are the overfill equipment being tested? I don’t see Matt’s notes on the smaller tank inspection, <br />what page is this on in the SPCC Plan? A testing letter and certification would be good, Matt said he could <br />provide one. <br />Thank you