My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MARIPOSA
>
4035
>
2800 - Aboveground Petroleum Storage Program
>
PR0522162
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2025 2:00:05 PM
Creation date
5/21/2025 11:31:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0522162
PE
2832 - AST FAC 10 K - </=100 K GAL CUMULATIVE
FACILITY_ID
FA0010104
FACILITY_NAME
A&A CONCRETE SUPPLY INC
STREET_NUMBER
4035
Direction
E
STREET_NAME
MARIPOSA
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
17907012
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
4035 E MARIPOSA RD STOCKTON 95205
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />Presto, Carol [EHD] <br />From:tugg@tutamail.com <br />Sent:Friday, May 23, 2025 7:47 AM <br />To:Presto, Carol [EHD] <br />Cc:Heather Macedo. McKenzie <br />Subject:RE: Plant Inspection Due 6-27-2027- Compliance Date Request Signed <br />Attachments:image003.jpg; image004.png; image005.png; image002.jpg; 20250522 Liquid Level <br />Inspection at Stockton A&A.pdf <br />Hi Carol, <br /> <br />Please find attached the inspection and testing letter for the oil tanks at the A&A Concrete Supply, Inc., <br />Stockton Plant. You will find the 5-year review/update requirement is on page 2 of the SPCCP which was <br />certified to be followed by Heather as the Regional Manager in responsible charge. <br /> <br />Hopefully this clears up the last pieces, and thanks for your assistance with the process. Please let us <br />know if there are any outstanding issues to resolve. <br /> <br />Regards, <br /> <br />Matt Tuggle, PE <br />707-365-7440 <br /> <br /> <br />May 20, 2025, 08:00 by cpresto@sjgov.org: <br />Hi Heather, <br /> <br />Thanks for checking in. I need to add your email to my contact list or something because it doesn’t come <br />up. Your email only had #30, #321, #57 but I previously emailed about #10 and #61 as well. <br />#10 – Pending a statement that 5 year reviews of the SPCC Plan will be conducted moving forward. FYI, these 5 <br />year reviews, can be done by A&A Management to verify no updates to the SPCC Plan are needed. <br />#30 – Closed <br />#32 – Closed <br />#57 – Closed <br />#61 – How are the overfill equipment being tested? I don’t see Matt’s notes on the smaller tank inspection, <br />what page is this on in the SPCC Plan? A testing letter and certification would be good, Matt said he could <br />provide one. <br />Thank you
The URL can be used to link to this page
Your browser does not support the video tag.