Laserfiche WebLink
Geosyntec <br /> consohants <br /> 6. SCHEDULE <br /> The proposed scope of work will commence upon CVRWQCB approval of this Work Plan. <br /> After obtaining Work Plan approval, the proposed scope of work is anticipated to be completed <br /> within the following timeframe: <br /> I <br /> • Boring permits from SJCEHD will be obtained within three to six weeks of Work Plan <br /> approval; <br /> • Depending on driller availability, drilling and injection activities are expected to begin <br /> within three weeks of boring permit approval,and will be completed in approximately four <br /> weeks; <br /> • Post-injection monitoring activities will be completed over an approximate 6-month <br /> period; and <br /> • An Implementation Report will be submitted to the CVRWQCB within 30 days of <br /> completing field activities. <br /> • Performance monitoring results will be included as part of routine semi-annual <br /> groundwater monitoring reporting. <br /> Former Source Area Injection Work Plan 13 August 08,2019 <br />