My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6475
>
2900 - Site Mitigation Program
>
PR0537637
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2026 11:05:14 AM
Creation date
6/23/2025 2:05:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0537637
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0021678
FACILITY_NAME
LINCOLN CENTER ENVIRONMENTAL REMEDIATION TRUST
STREET_NUMBER
6475
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
09741079
CURRENT_STATUS
Inactive, non-billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
6475 PACIFIC AVE STOCKTON 95207
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geosyntec <br /> consohants <br /> 6. SCHEDULE <br /> The proposed scope of work will commence upon CVRWQCB approval of this Work Plan. <br /> After obtaining Work Plan approval, the proposed scope of work is anticipated to be completed <br /> within the following timeframe: <br /> I <br /> • Boring permits from SJCEHD will be obtained within three to six weeks of Work Plan <br /> approval; <br /> • Depending on driller availability, drilling and injection activities are expected to begin <br /> within three weeks of boring permit approval,and will be completed in approximately four <br /> weeks; <br /> • Post-injection monitoring activities will be completed over an approximate 6-month <br /> period; and <br /> • An Implementation Report will be submitted to the CVRWQCB within 30 days of <br /> completing field activities. <br /> • Performance monitoring results will be included as part of routine semi-annual <br /> groundwater monitoring reporting. <br /> Former Source Area Injection Work Plan 13 August 08,2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.