Laserfiche WebLink
WELL INSTALLATION AND INTERIM REMEDIAL ACTION REPORT <br />www.arcadis.com <br />FINAL_Forward CHCF (CDCR) Well Installation Report_10182024 <br /> <br />iv <br />Tables <br />Table 1 Well Construction Details <br />Table 2 CDCR-EW-3 Step Test Results <br />Table 3 CDCR-EW-4 Step Test Results <br />Table 4 CDCR-EW-3 Constant Rate Test Design <br />Table 5 CDCR-EW-4 Constant Rate Test Design <br />Table 6 CDCR-EW-3 Constant Rate Test Hydraulic Response <br />Table 7 CDCR-EW-3 Combined Shallow/Intermediate Water-Bearing Zone Parameter Results <br />Table 8 CDCR-EW-3 HydroSieve Screen Parameter Estimations <br />Table 9 CDCR-EW-4 Constant Rate Test Hydraulic Response <br />Table 10 CDCR-EW-4 Combined Shallow/Intermediate Water-Bearing Zone Parameter Results <br />Table 11 CDCR-EW-4 HydroSieve Screen Parameter Estimations <br />Table 12 CDCR Baseline Groundwater Analytical VOC Data <br />Table 13 CDCR-EW-3 Hydraulic Testing Laboratory Analytical VOC Trend Summary <br />Table 14 CDCR-EW-4 Hydraulic Testing Laboratory Analytical VOC Trend Summary <br />Table 15 CDCR-EW-3 Hydraulic Capture Estimation <br />Table 16 CDCR-EW-4 Hydraulic Capture Estimation <br />Table 17 Proposed Groundwater Extraction Well Construction Details <br />Table 18 Current and Proposed Groundwater Gauging Program (in-text) <br /> <br />Figures <br />Figure 1 Site Map with Monitoring Points <br />Figure 2 Site Map with Monitoring Points: CDCR Property <br />Figure 3 CDCR-EW-3 Step Drawdown Discharge Trend <br />Figure 4 CDCR-EW-4 Step Drawdown Discharge Trend <br />Figure 5 CDCR 25 µg/L TVOC Plume for Third Quarter 2024 <br />Figure 6 Predicted Capture of CDCR 25 µg/L TVOC Plume with Existing Groundwater Extraction <br />Wells <br />Figure 7 Predicted Capture of CDCR 25 µg/L TVOC Plume with Additional Proposed Extraction <br />Well