Laserfiche WebLink
WELL INSTALLATION AND INTERIM REMEDIAL ACTION REPORT <br />www.arcadis.com <br />FINAL_Forward CHCF (CDCR) Well Installation Report_10182024 <br /> <br />v <br />Figure 8 Site Plan with Remedial System Layout <br />Figure 9 Groundwater Extraction and Treatment System Process Flow Diagram <br />Figure 10 Groundwater Extraction and Treatment System Piping and Instrumentation Diagram <br /> <br />Appendices <br />Appendix A San Joaquin County Environmental Health Department Boring Permit <br />Appendix B Soil Boring and Well Construction Logs <br />Appendix C Laboratory Analytical Results <br />Appendix D Field Data Sheets <br /> Appendix D-1: Well Development Logs <br /> Appendix D-2: Step Test Field Data Sheets <br /> Appendix D-3: Constant Rate Test Field Data Sheets <br /> Appendix D-4: Groundwater Sample Data Sheets <br />Appendix E Survey Data Report <br />Appendix F CDCR-EW-2 Hydraulic Assessment Data <br />Appendix G CDCR-EW-3 Hydraulic Assessment Outputs <br /> Appendix G-1: Hydrographs <br /> Appendix G-2: ROI <br /> Appendix G-3: AQTESOLV Output Files <br />Appendix G-4: HydrogeoSieve Output Files <br />Appendix H CDCR-EW-4 Hydraulic Assessment Outputs <br />Appendix H-1: Hydrographs <br /> Appendix H-2: ROI <br /> Appendix H-3: AQTESOLV Output Files <br />Appendix H-4: HydrogeoSieve Output Files <br />Appendix I Proposed Additional CDCR Extraction Well Construction Diagram <br />