My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAM
>
306
>
2900 - Site Mitigation Program
>
PR0548453
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2026 10:35:46 AM
Creation date
7/23/2025 2:14:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0548453
PE
2950 - ENVIRON ASSESS
FACILITY_ID
FA0027675
FACILITY_NAME
LAKEWOOD PLAZA
STREET_NUMBER
306
Direction
N
STREET_NAME
HAM
STREET_TYPE
LN
City
LODI
Zip
95252
APN
03710030
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
306 N HAM LN LODI 95252
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
674
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
09 October 2023 AdvancedGeo <br /> Project No. 23-7573 CLIENT —ATTORNEY PRIVILEGE An Employee-Owned Company <br /> Page 3 of 5 <br /> All appropriately sealed and labeled samples will be placed in a chilled container with ice <br /> and transported under chain-of-custody procedure to a California Environmental <br /> Laboratory Accreditation Program (ELAP)-certified laboratory. Each sample will be <br /> labeled with boring designation, depth, time, date, and sampler's initials. Soils <br /> encountered in the borings will be visually classified by AGI personnel in accordance with <br /> the Unified Soil Classification System (USCS). Field screening of soil samples shall be <br /> performed using an organic vapor meter (OVM), equipped with photo-ionization detector <br /> (PID) pre-calibrated to isobutylene. Soil samples will be analyzed for Volatile Organic <br /> Compounds (VOCs) in accordance with EPA method 8260B. <br /> 2.2. SOIL-VAPOR POINT INSTALLATION, SAMPLING AND ANALYSIS <br /> AGI proposes to install eighteen (18) soil vapor points at the site, within twelve (12) of <br /> the completed borings. Following soil sample collection at the deepest proposed locations <br /> (15 feet bsg), dual completed wells will be installed in each of the locations. A total of 17 <br /> feet of/4-inch diameter Teflon® tubing and a 2-inch-long polyethylene soil-vapor implant <br /> will be lowered to the bottom of the borehole. A filter pack of#2/12 sand will be added to <br /> approximately 14 feet bsg. Following placement of the filter pack, approximately 12 inches <br /> of dry granulated bentonite will be placed atop the filter pack to 13 feet bsg. Following the <br /> dry bentonite, hydrated bentonite will be used to fill the boring void to 5 feet bsg. At 5 feet <br /> bsg a total of 7 feet of '/4-inch diameter Teflon® tubing and a 2-inch-long polyethylene <br /> soil-vapor implant will be lowered to 5 feet bsg. A filter pack of #2/12 sand will be added <br /> to approximately 4 feet bsg. Following placement of the filter pack, approximately 12 <br /> inches of dry granulated bentonite will be placed atop the filter pack to 3 feet bsg. <br /> Following the dry bentonite, hydrated bentonite will be used to fill the boring void to near <br /> surface grade to prevent ambient air intrusion. <br /> For the five proposed 10-foot vapor sampling locations, the direct push rods will be <br /> advanced to the total proposed depth and soil samples will not be collected. Once the <br /> total depth is reached a total of 12 feet of diameter Teflon® tubing and a 2-inch- <br /> long polyethylene soil-vapor implant will be lowered to 10 feet bsg. A filter pack of#2/12 <br /> sand will be added to approximately 9 feet bsg. Following placement of the filter pack, <br /> approximately 12 inches of dry granulated bentonite will be placed atop the filter pack to <br /> 8 feet bsg. Following the dry bentonite, hydrated bentonite will be used to fill the boring <br /> void to near surface. <br /> Following soil-vapor well installations, a minimum 2-hour stabilization period will be <br /> observed prior to soil-vapor sample collection from the vapor points. For sample <br /> collection, a one-liter Summa canister and 60ml purge syringe will be connected with a <br /> dedicated and serialized sampling inlet manifold to the vapor point tubing. The sampling <br /> inlet manifold will consist of an air/vapor-tight valve; a particulate filter; a flow restrictor <br /> calibrated to 150 milliliters per minute (ml/min), a stainless-steel tee-fitting, two vacuum <br /> gauges at either end of the controller and connections for both purge syringe and <br /> sampling canister (manifold assembly). Prior to sample collection, each soil-vapor well <br />
The URL can be used to link to this page
Your browser does not support the video tag.