Laserfiche WebLink
Lakewood Plaza AdvancedGeo <br /> Project No. 23-7523 An Employee-Owned Compony <br /> Page 2 of 6 -� <br /> 3.0. ON-SITE CONTROL <br /> The Site Safety Officer will coordinate site access control and security. An exclusion <br /> zone will be established approximately 20 feet around excavation location work areas. <br /> No unauthorized person shall be allowed within this exclusion area. <br /> 4.0. HAZARD EVALUATION <br /> The following substance(s) or hazards are known or suspected to be on site. <br /> F__SUBSTANCES INVOLVED: CONCENTRATIONS: <br /> Volatile Organic Compounds - VOCs Up to 13,000 ug/m3 <br /> ADDITIONAL POTENTIAL HAZARDS INCLUDE: <br /> SLIP-TRIP-FALL NOISE <br /> HEAVY EQUIPMENT VIBRATION HAZARDS <br /> TRAFFIC HAZARDS <br />