Laserfiche WebLink
Lakewood Plaza AdvancedGeo <br /> Project No. 23-7523 An Employee-Owned Compony <br /> Page 3 of 6 -� <br /> 5.0. PERSONAL PROTECTIVE EQUIPMENT <br /> Based on evaluation of potential hazards, the following levels of personal protection <br /> have been designated for the applicable work areas or task: <br /> LOCATION: JOB FUNCTION: LEVELS OF PROTECTION: <br /> EXCLUSION ZONE EXCAVATION AREA A B C D Other <br /> REDUCTION ZONE PRESERVE SAMPLES A B C D Other <br /> SUPPORT ZONE SUPPORT FUNCTIONS A B C D Other <br /> Specific protective equipment for each level of protection used is follows: <br /> HARD HAT <br /> STEEL-TOED BOOTS <br /> LEVEL D: HALF-FACED RESPIRATOR <br /> GLOVES <br /> SAFETY GLASSES <br /> If air purifying respirators are authorized, organic vapor and dust is the appropriate <br /> canister for use with the involved substances and concentrations. No down-grading <br /> changes of the specified levels of protection shall be made without the approval of the <br /> site safety officer and the project team leader. <br /> 6.0. ON-SITE WORK PLANS <br /> Work party(ies) consisting of two persons will perform the following tasks: <br /> PROJECT TEAM LEADER: TASK: <br /> Daniel Villanueva Supervise, collect samples <br /> FIELD CREW: TASK: <br /> Keith Lindgren Advance boring, collect samples <br /> Rick Marty Advance boring, collect samples <br />