My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAM
>
306
>
2900 - Site Mitigation Program
>
PR0548453
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2026 11:57:30 AM
Creation date
7/23/2025 2:14:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0548453
PE
2950 - ENVIRON ASSESS
FACILITY_ID
FA0027675
FACILITY_NAME
LAKEWOOD PLAZA
STREET_NUMBER
306
Direction
N
STREET_NAME
HAM
STREET_TYPE
LN
City
LODI
Zip
95252
APN
03710030
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
306 N HAM LN LODI 95252
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
682
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Soil Vapor Extraction Well Installation Work Plan <br /> LAKEWOOD PLAZA <br /> 308 North Ham Lane, Lodi, California <br /> 1.0. INTRODUCTION <br /> Advanced Geo, Inc. (AGI) has prepared this Soil Vapor Extraction Well Installation Work <br /> Plan for Lakewood Plaza located at 308 North Ham Lane, Lodi, California (site or subject <br /> site). This work plan details the scope of work and procedures for advancement of eight <br /> (8) pilot borings for the installation of soil vapor extraction (SVE) wells. <br /> A plan of the site illustrating proposed SVE well locations is included as Figure 1. <br /> 2.0. SCOPE OF WORK <br /> Based on the historical and current use of the property, AGI proposes the following tasks: <br /> • Permitting and pre-field work activities. <br /> • Pilot soil boring advancement. <br /> • SVE well installation. <br /> • Report preparation. <br /> Each of these tasks is described in greater detail below. <br /> 2.1. PRE-FIELD WORK ACTIVITIES <br /> Applicable site assessment/drilling permits will be obtained from San Joaquin County <br /> Environmental Health Department (SJCEHD). In addition, a health and safety plan will be <br /> updated in accordance with Occupational Safety and Health Guidance Manual for <br /> Hazardous Waste Site Activities (National Institute for Occupational Safety and Health <br /> Administration, U.S. Coast Guard and U.S. Environmental Protection Agency, 1985). <br /> Prior to mobilization, each proposed boring location will be clearly pre-marked, and a <br /> utility clearance obtained through Underground Service Alert. <br /> 2.2. DRILLING AND SOIL SAMPLE COLLECTION AND ANALYSIS <br /> AGI proposes to advance eight (8) pilot soil borings to total depths of 15, 20, and 30 feet <br /> below surface grade for the installation of SVE wells. The soil borings will be advanced <br /> utilizing either a six-inch diameter hand auger (interior locations) or a direct push drilling <br /> rig equipped with 8.25-inch diameter hollow stem augers. The total depths of the wells <br /> may vary according to geologic/hydrogeologic conditions encountered during drilling. The <br /> proposed pilot borings/SVE well locations are illustrated in Figure 1 . <br />
The URL can be used to link to this page
Your browser does not support the video tag.