My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAM
>
306
>
2900 - Site Mitigation Program
>
PR0548453
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2026 11:57:30 AM
Creation date
7/23/2025 2:14:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0548453
PE
2950 - ENVIRON ASSESS
FACILITY_ID
FA0027675
FACILITY_NAME
LAKEWOOD PLAZA
STREET_NUMBER
306
Direction
N
STREET_NAME
HAM
STREET_TYPE
LN
City
LODI
Zip
95252
APN
03710030
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
306 N HAM LN LODI 95252
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
682
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
08 May 2024 AdvancedGeo <br /> Project No. 23-7523 An Employee-Owned Company <br /> Page 3of3 n; G <br /> interval. A nominal one to two-foot bentonite seal will be placed above the filter pack. The <br /> bentonite seal will be formed by pouring bentonite chips into the annulus and allowing <br /> them to settle on the filter pack. The bentonite will be allowed to hydrate for a minimum <br /> of one-half hour prior to completing the well. The remaining annular space will be filled to <br /> the ground surface with a cement grout. The grout mixture will consist of Type 1/11 Portland <br /> neat cement. A grouting inspection will be scheduled with SJCEHD personnel. <br /> 3.3. EQUIPMENT DECONTAMINATION/WASTE MANAGEMENT <br /> All sampling tools used for sample collection will be thoroughly rinsed with clean water <br /> after being washed with a solution of Alconox. All down-hole drilling equipment will be <br /> pressure washed prior to starting a new pilot boring. Cuttings generated during drilling <br /> and/or any rinseate generated during drilling activities will be containerized in properly <br /> labeled DOT-approved 55-gallon drums and stored on-site in an area generally lacking <br /> public access. Disposal alternatives will be evaluated based on results of soil and water <br /> analysis. <br />
The URL can be used to link to this page
Your browser does not support the video tag.