My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
STOCKTON
>
125
>
2900 - Site Mitigation Program
>
PR0548037
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2026 11:48:18 AM
Creation date
7/23/2025 2:39:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0548037
PE
2950 - ENVIRON ASSESS
FACILITY_ID
FA0027411
FACILITY_NAME
CITY OF LODI PARKS AND RECREATION DEPARTMENT
STREET_NUMBER
125
Direction
N
STREET_NAME
STOCKTON
STREET_TYPE
ST
City
LODI
Zip
95240
APN
043084130
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
125 N STOCKTON ST LODI 95240
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
287
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sampling and Analysis Plan for Phase II Environmental Site Assessment <br /> 125 North Stockton Street, Lodi,CA 95240 <br /> .J INTRODUCTION <br /> 1 .1 General Project Information <br /> Stantec Consulting Services Inc. (Stantec) has prepared this site-specific Sampling and Analysis <br /> Plan (SAP) for a Phase II Environmental Site Assessment (ESA) at the property located at 125 North <br /> Stockton Street, Lodi, California (the Property or Site).The Site was deemed eligible for use of USEPA <br /> brownfield funding on April 1, 2021 as a site with suspected impacts from hazardous materials. All <br /> work described herein will be completed in accordance with the revised Master Quality Assurance <br /> Project Plan (Master QAPP) prepared for the City of Lodi Community-Wide Brownfields Assessment <br /> Project (Cooperative Agreement Number BF-99T30201) dated April 14, 2017 and approved by the <br /> United States Environmental Protection Agency (USEPA) on August 1, 2017. <br /> 1 .2 Project Organization and Distribution List <br /> Stantec Project Manager Neil Doran will lead the project implementation team. Key team <br /> member roles and responsibilities are summarized below. Any changes to this organizational <br /> structure will be documented in an amendment to this SAP. <br /> USEPA Region 9 Brownfields Project Officer: Kelly Garbach <br /> Phone: (415) 972-3300 <br /> The USEPA Region 9 Brownfields Project Officer (PO) will review the SAP and monitor activities <br /> during completion of the project. <br /> USEPA Region 9 Quality Assurance Manager: Audrey Johnson <br /> Phone: (415) 972-3431 <br /> The USEPA Region 9 Quality Assurance Manager will review and approve the SAP. <br /> City of Lodi Project Manager: Astrida Trupovnieks <br /> Phone: (209)333-6807 <br /> The City of Lodi Project Manager (PM) is the primary point of contact for all communication with <br /> the USEPA and Stantec. The City of Lodi PM is responsible for overall project management, <br /> contract management, project cost accounting, and all other business-related project tasks.The <br /> City of Lodi PM will coordinate all required reporting to the USEPA PO. <br /> Stantec Quality Assurance Manager: David Holmes, PG <br /> Phone: (262) 643-9177 <br /> Mr. Holmes will also serve as the Quality Assurance (QA) Manager and be responsible for <br /> maintaining and complying with the Master QAPP and SAP. <br /> Stantec Project Manager/Field Manager/Health and Safety Officer: Neil Doran, PG <br /> Phone: (916)473-3933 <br /> The Stantec PM, Mr.Neil Doran,will coordinate all project activities, provide technical support and <br /> (4 Stantec <br />
The URL can be used to link to this page
Your browser does not support the video tag.