My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
STOCKTON
>
125
>
2900 - Site Mitigation Program
>
PR0548037
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2026 11:48:18 AM
Creation date
7/23/2025 2:39:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0548037
PE
2950 - ENVIRON ASSESS
FACILITY_ID
FA0027411
FACILITY_NAME
CITY OF LODI PARKS AND RECREATION DEPARTMENT
STREET_NUMBER
125
Direction
N
STREET_NAME
STOCKTON
STREET_TYPE
ST
City
LODI
Zip
95240
APN
043084130
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
125 N STOCKTON ST LODI 95240
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
287
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 2:SAMPLING RATIONALE AND PROPOSED LABORATORY ANALYSES FOR SOIL,SOIL VAPOR,AND QA/QC SAMPLES <br /> Phase II Environmental Site Assessment,125 N Stockton Street,Lodi,CA <br /> Targeted Concerns(see table at the bottom of page Analyses for Soil Analyses for Soil Samples <br /> Borehole Sample ID Sample for details on Concerns A-F) Vapor <br /> ID Depth(tt) VOCs and Helium PAHs <br /> A B C D E F (Method TO-15/ (Method 8270 Arsenio Lead Asbestos VOCs&TPHg TPHd&TPHo <br /> ASTM D-1945) SIM) (Method 6010B) (Method 6010B) (Method 600) (Method 8260B) (Method 8015) <br /> B1-S-1 1 X X X X <br /> B1-S-3 3 X X H H <br /> B1-S-5 5 X X H H X X <br /> B1 B1-S-10 10 X H H X X <br /> B1-S-15 15 X H H <br /> B1-SV-5 5 X X <br /> B1-SV-15 15 X X <br /> B2-S-1 1 X X X X X X <br /> B2 B2-S-3 3 X X H H X X <br /> B2-S-5 5 X X H H H H <br /> B3-S-1 1 X X X X X X <br /> B3 B3-S-3 3 X X H H X X <br /> B3-S-5 5 X X H H H H <br /> B4-S-1 1 X X X X X X <br /> B4-S-3 3 X X H H X X <br /> B4 B4-S-5 5 X X H H H H <br /> B4-SV-5 5 X X X <br /> B4-SV-15 15 X X X <br /> B5-S-1 1 X X X X X X <br /> B5 B5-S-3 3 X X H H X X <br /> B5-S-5 5 X X H H H H <br /> B6-S-1 1 X X X X X X X X <br /> BB-S-3 3 X X X X H H X X <br /> B6 B6-S-5 5 X X H H H H H H <br /> B6-SV-5 5 X X X <br /> B6-SV-15 15 X X X <br /> B7-S-1 1 X X X X X X X X <br /> B7 B7-S-3 3 X X X X H H X X <br /> B7-S-5 5 X X H H H H H H <br /> B8-S-1 1 X X X X X X X X <br /> B8 BB-S-3 3 X X X X H H X X <br /> B8-S-5 5 X X H H H H H H <br /> B9-S-1 1 X X X X X X X X <br /> B9 B9-S-3 3 X X X X H H X X <br /> 89-S-5 5 X X H H H H H H <br /> B10-S-1 1 X X X <br /> B10-S-3 3 X H H <br /> B10 B10-S-5 5 X H H <br /> B10-SV-5 5 X X <br /> B10_SV_j <br /> 51 15 1 1 1 X X <br /> Total#of Samples to be Analyzed 8 8-12 8-12 10-21 10-21 18-27 18-27 <br /> Trip Blank One per day of soil sampling at the Property. -- -- -- 3' <br /> Al least 1 per 20 soil samples,min 1 per day of soil sampling <br /> QmQC Equipment Blank per piece of reusable equipment. -- 3-6 3-6 3-6 3-6 3-6 3-6 <br /> Samples <br /> MS/MSD At least 1 per 20 samples. 1 1 1 1-2 1-2 1-2 1-2 <br /> Field Duplicates At least 1 per 10 samples. 1 1-2 1-2 1-3 1-3 2-3 2-3 <br /> Total Estimated Number of QA/QC Samples to be Analyzed per Method 2 5-6 5-6 5-8 5-8 9-11 9-11 <br /> Notes: COCs=constituents of concern;DTSC=Department of Toxic Substances Control;MS/MSD=matrix spike/matrix spike duplicate;OSHA=Occupational Safety and Health Administration;PAHs=polycyclic <br /> aromatic hydrocarbons;QA/QC=quality assurance/quality control;SIM=selective ion monitoring;SLs=screening levels;TPHg/d/o=total petroleum hydrocarbons as gasoline/diesel/oil;VOCs=volatile <br /> organic compounds. <br /> An X indicates the collected sample will be scheduled for analysis.An H indicates the collected sample will be held pending analysis should the overlying sample report elevated concentrations of constituents <br /> that require vertical delineation. <br /> 1-An estimated three trip blanks will be required for the proposed scope of work;however,should soil sampling be take more than two days,additional trip blanks will be required to maintain the'one per day <br /> of soil sampling'rate. <br /> Key Environmental Concern Primary COCs <br /> A Potential residual impacts to soil from former manufactured gas plant. TPHg/d/o,VOCs,PAHs,lead,and arsenic <br /> B Potential impacts to soil and soil vapor from former UST. TPHg/d/o,VOCs,and lead <br /> C Potential impacts to soil vapor from regional solvent plume in groundwater. VOCs <br /> D Potential impacts from spills within workshop building. TPHg/d/o,VOCs,and lead <br /> E Potential impacts from spills or leaks associated with the current AST. TPHg/d and VOCs <br /> F Potential presence of lead-containing materials and asbestos in demolition debris beneath the Property. Lead and asbestos <br /> Stantec Page 1 of 1 8/12/2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.