Laserfiche WebLink
SAP/QAPP Addendum <br /> Lodi-125 N Stockton <br /> Final <br /> March 24,2025 <br /> Building materials,soil,soil gas,and indoor air material AOCs for the project are listed in Site-Specific <br /> QAPP Worksheet#15 (at the end of this section) along with associated SLs.The scoping team selected <br /> those AOCs based on professional judgment as to contaminants expected to be present at the Site. <br /> Results will be evaluated according to the following criteria: <br /> • If analyses of building material,soil,soil gas,and indoor air samples indicate concentrations of AOCs <br /> exceeding SLs,EPA or the Applicant may recommend additional characterization,removal,or <br /> remediation of impacted building material, soil,soil gas,and indoor air or find that Site conditions <br /> are not suitable for the planned redevelopment. <br /> • If analyses of building material,soil,soil gas,and indoor air samples indicate concentrations of AOCs <br /> less than SLs,EPA or the Applicant may recommend further characterization or find that Site <br /> conditions are suitable for the planned redevelopment. <br /> 3.3 Measurement Quality Objectives <br /> Measurement quality objectives are criteria established to assess the viability and usability of data.These <br /> objectives are based on both field and laboratory protocols that examine whether data quality indicators <br /> (DQI) meet the established criteria for the project.The Toeroek Team developed the DQI goals for this <br /> project by following the guidelines in EPA Guidance for QAPPs (EPA 2002). <br /> To ensure representativeness of sampling results,all sampling will accord with procedures detailed in <br /> Sections 4.0 and 6.0,as well as standard operating procedures (SOPS). Site-Specific QAPP Worksheet#10 <br /> and Site-Specific QAPP Worksheet#12 (at the end of this section) document DQOs and DQIs for this <br /> project.DQIs presented in Site-Specific QAPP Worksheet#12 and the laboratory's QA/QC criteria have <br /> been reviewed by the Toeroek Team and meet project requirements.The laboratory's reporting limits are <br /> determined to be appropriate for this project by the Toeroek Team. <br /> 3.4 Data Review and Validation <br /> Because of the limited scope,limited duration,and investigative nature of this project,the data will not <br /> undergo data validation by a third party but will be reviewed by an independent Toeroek Team QA manager. <br /> See QAPP Worksheets #35 and#36 in the Final Programmatic QAPP Revision 2 (EPA R9/QA DCN: <br /> FY22BNFD227) (Toeroek Team 2022) for the data validation procedures and documentation requirements. <br /> 13 <br />