Laserfiche WebLink
SAP/QAPP Addendum <br /> Lodi-125 N Stockton <br /> Final <br /> March 24,2025 <br /> the age and approximate square footages of the unoccupied office building,an estimated 10 suspected PCB <br /> caulk samples will be collected. Suspect PCB samples will be extracted via EPA Method 3540 and analyzed <br /> via EPA Method 8082. Sampling locations and sampling and analytical methods are conveyed in Site- <br /> Specific QAPP Worksheet#18. <br /> 6.5 Soil Sampling <br /> To assess whether contamination from previous MGP activities and a historical UST is present on the Site, <br /> soil samples will be collected as summarized in Table 5-1 and shown on Figure 3 and Figure 4. <br /> 6.5.1 Historical Manufactured Gas Plant Soil Sampling <br /> Seven discrete subsurface soil borings from biased locations will be advanced inside and adjacent to the <br /> approximate location of the historical MGP (Stantec,Inc. 2023) via a direct-push technology(DPT) drill rig <br /> to 5 feet bgs (Figure 3). Soil samples will be collected from 0.5 to 1 feet bgs,2 to 3 feet bgs,and 3 to 5 feet <br /> bgs from each location.Because these locations on the Site are paved with concrete,concrete coring may be <br /> required;the concrete and base rock presumed to be underneath will not be included in the first sample <br /> increment. <br /> Before soil boring advancement,a utility locator will be used to clear each of the seven soil boring locations <br /> for buried utility lines. Should utilities be identified in the proposed sample area,the impacted soil boring will <br /> be relocated such that a 5-foot buffer from the buried utility is maintained.In addition,soil borings will be <br /> advanced the first 5 feet bgs using a hand auger,further reducing the risk to damaging underground utilities. <br /> Soil samples will be analyzed for arsenic and lead via EPA Method 6010,TPH will be extracted via EPA <br /> Method 3541 and analyzed via EPA Method 8015M (TPH-g,TPH-d,and TPH-mo),and PAH will be <br /> extracted via EPA Method 3541 and analyzed via EPA Method 8270-SIM. <br /> To collect soil samples for TPH-g,the Toeroek Team will use a single-use Terra Core® sampler and place <br /> collected contents of the sampler into 40-milliliter vials,each with the appropriate preservative for the <br /> specified analysis. For all other sample collection,the Toeroek Team will collect each sample using single-use <br /> trowels and glass bottles.The soil samples will be placed into an appropriate sample container,appropriately <br /> packaged,and sent to the laboratory for analysis. <br /> All soil sample preservation will accord with analytical laboratory requirements outlined in Site-Specific <br /> QAPP Worksheet#19. Samples will be collected,labeled,recorded,packed,and shipped per Toeroek Team <br /> 52 <br />