My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
2154
>
2900 - Site Mitigation Program
>
PR0543662
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2026 10:51:47 AM
Creation date
9/4/2025 9:40:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0543662
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0024811
FACILITY_NAME
MCBILLIN REAL ESTATE INVESTMENT
STREET_NUMBER
2154
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16705021
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
2154 S EL DORADO ST STOCKTON 95206
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
transport. Cooling samples will cause condensation of trailer consist of an air compressor, two 150-gallon <br /> moisture within the sample, thereby distorting the laboratory polyethylene tanks, pneumatic pumps, and hoses. <br /> analysis. <br /> The injection hoses are attached to the desired injection <br /> To minimize the potential for cross-contamination between wells via an injection access point. The injection access <br /> air samples, the polyethylene tubing is replaced with new point consists of/2-inch stainless steel tee which screws into <br /> tubing. a coupling attached to the injection well and injection hose. <br /> The coupling is glued to the injection well at least 48 hours <br /> Vapor samples are also subject to the same hold times and prior to the injection even to ensure the PVC glue has time to <br /> must be stored as stated in SOP-10. properly set and the well elevation is resurveyed. <br /> SOP-16 After the injection hoses are attached to the desired wells, <br /> SOIL GAS SAMPLING FROM SOIL VAPOR POINT the trailer-mounted tanks are filled with potable water from <br /> an onsite source. As the tanks fill, the chemical oxidant is <br /> Installation of a soil vapor point may be performed with a mixed into the tank. The amount of oxidant mixed in the <br /> hand auger or truck mounted auger drilling rig. Once the tank is dependent on the desired concentration of the <br /> boring has achieved the desired depth, a 6-inch long slotted solution. After the tanks have been filled, the trailer-mounted <br /> probe, capped on both ends with one end fitted with a air compressor is started and air is supplied to the pneumatic <br /> Swagelok fitting attached to 3/16-inch diameter Nylon tubing pumps. The pneumatic pumps force the solution into the <br /> of desired length is placed in the boring and 12 inches of well through the injection hoses at a maximum of 20 pounds <br /> filter pack placed in the annulus. A layer of dry bentonite per square inch gauge(psig). The pressure of injection is <br /> powder or chips, followed by a layer of hydrated bentonite, controlled by a valve and can be reduced, if necessary to <br /> and a final layer of dry bentonite powder or chips will be avoid damaging the well and well seal. Additionally, each <br /> placed in the annulus above the filter pack. Excess tubing at injection access point is equipped with a pressure gauge to <br /> the top is coiled and placed in a flush finished well box. monitored the pressure at each injection well individually. <br /> Soil vapor samples will be collected no sooner than one After the total volume of solution has been injected, the <br /> week after probe installation to permit soil vapors to tanks are washed down with potable water to remove any <br /> accumulate within the probe. Soil vapor sampling will occur chemical residue from the tank. The rinsate water is then <br /> after a minimum of five consecutive precipitation-free days injected into the well to clean out the hoses. After the <br /> and after any on site irrigation has ceased. injection activities have terminated, the injection access <br /> points are left on the wells to ensure that pressure in the <br /> The sampling equipment consists of a TedlarTm bag wells declines to background levels prior to removing the <br /> (available in 1, 3, 5, and 10 liter sizes), a diaphragm pump, access points and hoses. A pressure relief valve is located <br /> and 3/16-inch-diameter polyethylene tubing (approximately 1 on the access points to relieve any excess pressure above <br /> foot long). The TedlarTm bag should be fitted with an integral 20 psig. <br /> valve for filling and sealing the bag after sampling. The <br /> diaphragm pump inlet and outlet are fitted with 3/16-inch <br /> hose barbs for attaching the sample tubing. A sample label <br /> with the sample number and date and time of sample <br /> collection is prepared and placed on the TedlarTm bag. <br /> The sampling procedure requires the end of the tubing from <br /> the probe be connected to the diaphragm pump inlet hose <br /> barb to form an air-tight connection. The sampling pump is <br /> then started and the pump is purged for 1 minute with the <br /> vapor to be sampled. Following purging, the discharge of <br /> the pump is then connected to the TedlarTm bag using a <br /> section of 3/16-inch tubing. The pump is restarted and the <br /> bag is opened and allowed to fill to approximately 3/4 of its <br /> capacity. Caution should be taken not to overfill the <br /> sampling bag. The sample is placed in a non-refrigerated <br /> dry cooler with sufficient packing to prevent damage during <br /> transport. Cooling samples will cause condensation of <br /> moisture within the sample, thereby distorting the laboratory <br /> analysis. <br /> To minimize the potential for cross-contamination between <br /> air samples, the polyethylene tubing on the discharge side of <br /> the pump is replaced with new tubing. <br /> Vapor samples are also subject to the same hold times and <br /> must be stored as stated in SOP-10. <br /> SOP-17 <br /> PRESSURIZED SOLUTION INJECTION <br /> For remediation purposes, a portable injection trailer is used <br /> to inject a solution of potable water and a chemical oxidant <br /> suited to remediate contamination at the site. The injection <br />
The URL can be used to link to this page
Your browser does not support the video tag.