My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
2154
>
2900 - Site Mitigation Program
>
PR0543662
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2026 10:51:47 AM
Creation date
9/4/2025 9:40:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0543662
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0024811
FACILITY_NAME
MCBILLIN REAL ESTATE INVESTMENT
STREET_NUMBER
2154
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16705021
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
2154 S EL DORADO ST STOCKTON 95206
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
15' Tall 3" <br /> LEGEND Diameter <br /> Sample Port <br /> Stack <br /> OFlow Indicator <br /> O Temperature Indicator Fl <br /> PI Pressure Indicator Influent <br /> Dilution Air Sample Port <br /> O Flow Totalizer Or FloZsmitt <br /> PI <br /> ® Low Pressure Switch <br /> ® High Pressure Switcrt Recirculation Valve n <br /> ® High Temperature S <br /> NN High LevelPI n PI Fl P <br /> BL Start Floator <br /> O Stop Float <br /> Positive Thermal/Catalytic JOxIdlizerDisplacementBlowermister Pad Vapor Extraction Well <br /> Influent SamplePartPI PI PI PI PI1-10 <br /> Water Total'¢er <br /> To Holding Tank (As Shown on Figure 6b) <br /> Air/Water AWS <br /> Separator Pump <br /> ' I Buried <br /> Piping <br /> ' I Additional Piping For <br /> cal n N M �n Future Expansion <br /> a a a a a a <br /> DRAWN BY. N. Rouillard <br /> PROCESS FLOW DIAGRAM-MPE SYSTEM, FIGURE <br /> DATE: 4/26/22 VAPOR EXTRACTION <br /> Proposed MPE Wells REVISIONS <br /> J/0APEX McBillin Real Estate Investment Property 6a <br /> EWRoiECH, INC. 2154 South El Dorado Street LPROJECT NUMBER <br /> Stockton, California BR52.001 <br />
The URL can be used to link to this page
Your browser does not support the video tag.