My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
2154
>
2900 - Site Mitigation Program
>
PR0543662
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2026 10:51:47 AM
Creation date
9/4/2025 9:40:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0543662
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0024811
FACILITY_NAME
MCBILLIN REAL ESTATE INVESTMENT
STREET_NUMBER
2154
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16705021
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
2154 S EL DORADO ST STOCKTON 95206
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LEGEND <br /> 2' 9 <br /> It Check Valve Exhaust <br /> Stack 12' <br /> Flow Control Valve High <br /> Sample Port <br /> LGAC Liquid—Phase Granular Activated Carbon <br /> VGAC Vapor—Phase Granular Activated Carbon 7V�GAC <br /> 1,000 Le FI <br /> vcAc z <br /> n <br /> O Flow Indicator PI <br /> OTemperature Indicator q <br /> PI Pressure Indicator Y <br /> HH High Level Float <br /> HL Start Float Ff PS PI PI Pl <br /> OStop Float 500—Ga1 XH <br /> Influent Air Stripper <br /> Holding HL Influent Sample <br /> Water From Air Water Se arator T°nk PortLB <br /> P LL 2,000 1 LGAC LB LGAC 3 <br /> (As Shown On Figure 6a) Water M LGAC 1 LGAC 2 LGAC 3 <br /> P Out Fl <br /> Air Transfer PI 500—lb. <br /> Stripper Pump Liquid Phase Carbon Vessels <br /> F1 <br /> Vapor <br /> out Effluent <br /> Sample Port <br /> It t } t It Zt It Zt It It PI <br /> 3—Hp To Infiltration Trench Q <br /> Vacuum Relief Valve Flow <br /> Totalizer <br /> Totalizer <br /> Transfer <br /> Pump <br /> VaWte Effluent Flow Meter <br /> Future 2' Pipe Run For Future <br /> N M N M Expansion <br /> I I I I I I I I I <br /> �y a a a a aW a DRAWN BY: N. Rouillard <br /> SYSTEM,PROCESS FLOW DIAGRAM-MPE FIGURE <br /> DATE 4/26/22 GROUNDWATER EXTRACTION MN AND TREATMENT <br /> REVISIONS 6b <br /> Proposed MPE wells ///APEX McBillin Real Estate Investment Property <br /> EWROTECH, INC. 2154 South El Dorado Street PROJECT NUMBER. <br /> Stockton, California MBR52.001 <br />
The URL can be used to link to this page
Your browser does not support the video tag.