Laserfiche WebLink
Queuing and Blocking ReportExisting plus Project AM01/12/2025Existing plus Project AM Foothill and North County Landfills Study SimTraffic ReportW-TransPage 1Intersection: 1: SR 88 & E Harney LnMovement EB WB NB NB SB SBDirections Served LTR LTR L TR L TRMaximum Queue (ft) 111 162 44 127 61 158Average Queue (ft) 45 72 11 44 13 6795th Queue (ft) 88 129 32 98 44 131Link Distance (ft) 2539 7781 2683 3543Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft) 125 140Storage Blk Time (%) 0 1Queuing Penalty (veh) 0 0Intersection: 2: Jack Tone Rd & E Harney LnMovement EB EB WB WB NB NB SB SBDirections Served LT R LT R LT R LT RMaximum Queue (ft) 84 49 113 60 60 53 62 39Average Queue (ft) 38 10 46 21 28 13 28 1795th Queue (ft) 70 36 84 54 47 41 50 38Link Distance (ft) 7781 4982 2775 1650Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft) 25 25 25 25Storage Blk Time (%) 7 1 1028172Queuing Penalty (veh)11331132Intersection: 3: Site Driveway & E Harney LnMovement NB NBDirections Served L RMaximum Queue (ft) 82 22Average Queue (ft) 31 495th Queue (ft) 68 20Link Distance (ft) 1889Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft) 50Storage Blk Time (%) 1Queuing Penalty (veh) 0Queuing and Blocking ReportExisting plus Project AM01/12/2025Existing plus Project AM Foothill and North County Landfills Study SimTraffic ReportW-TransPage 2Intersection: 4: Clements Rd & E Harney LnMovement EB WB NB SBDirections Served LTR LTR LTR LTRMaximum Queue (ft) 60 25 32 3Average Queue (ft) 2343095th Queue (ft) 50 18 18 3Link Distance (ft) 5909 2622 2606 2647Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft)Storage Blk Time (%)Queuing Penalty (veh)Network SummaryNetwork wide Queuing Penalty: 14