Laserfiche WebLink
Queuing and Blocking ReportExisting plus Project PM01/12/2025Existing plus Project PM Foothill and North County Landfills Study SimTraffic ReportW-TransPage 1Intersection: 1: SR 88 & E Harney LnMovement EB WB NB NB SB SBDirections Served LTR LTR L TR L TRMaximum Queue (ft) 156 127 45 136 63 151Average Queue (ft) 71 51 11 60 21 6095th Queue (ft) 129 98 33 108 49 116Link Distance (ft) 2539 7781 2683 3543Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft) 125 140Storage Blk Time (%) 0 0Queuing Penalty (veh) 0 0Intersection: 2: Jack Tone Rd & E Harney LnMovement EB EB WB WB NB NB SB SBDirections Served LT R LT R LT R LT RMaximum Queue (ft) 57 50 69 56 64 59 66 39Average Queue (ft) 26 21 31 14 28 16 29 995th Queue (ft) 44 47 53 44 48 44 50 32Link Distance (ft) 7781 4982 2775 1650Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft) 25 25 25 25Storage Blk Time (%)63819291Queuing Penalty (veh)22212211Intersection: 3: Site Driveway & E Harney LnMovement NB NBDirections Served L RMaximum Queue (ft) 36 29Average Queue (ft) 17 395th Queue (ft) 39 16Link Distance (ft) 1889Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft) 50Storage Blk Time (%) 0Queuing Penalty (veh) 0Queuing and Blocking ReportExisting plus Project PM01/12/2025Existing plus Project PM Foothill and North County Landfills Study SimTraffic ReportW-TransPage 2Intersection: 4: Clements Rd & E Harney LnMovement EB WB NBDirections Served LTR LTR LTRMaximum Queue (ft) 51 17 27Average Queue (ft) 22 2 295th Queue (ft) 43 11 13Link Distance (ft) 5909 2622 2606Upstream Blk Time (%)Queuing Penalty (veh)Storage Bay Dist (ft)Storage Blk Time (%)Queuing Penalty (veh)Network SummaryNetwork wide Queuing Penalty: 14